Search


Start a new search
Add filters:

Use filters to refine the search results.


Results 851-860 of 1347 (Search time: 0.005 seconds).
Item hits:
Issue DateTitleAuthor(s)???itemlist.dc.contributor.advisor???
1-Sep-2024LKP Wandra 218150037 Usulan Perbaikan System Inventori dan Tata Letak dengan Metode Activity Based Costing (ABC) pada PT. Industri Nabati Lestari (INL)WandraSilviana, Nukhe Andri
18-Oct-2024LKP Ariski Ananda Pinem 218130084 Proses Pengolahan Kelapa Sawit Menjadi Crude Palm Oil (CPO)Pinem, Ariski AnandaAldori, Yopan Rahmad
19-Sep-2024LKP Ridhika Adabiansyah 218150011 Analisis Sistem Antrian Truck Tangki di PT. Industri Nabati LestariAdabiansyah, RidhikaSiregar, Ninny
Jan-2025LKP Wahyu Qurahman 228150019 Produksi Sepatu CV. KotamaQurahman, WahyuSilviana, Nukhe Andri
Dec-2024LKP Muhammad Riski 218150044 PT. Karya Serasi Jaya Abadi Sumatera UtaraAnggi, Muhammad RiskiBanjarnahor, Marali
Jul-2022Sistem Pendinginan Air pada Generator di ULPLTG Unit 7 Paya PasirBuhari, Dendhy Fahrezi-
Jan-2025Laporan Pendamping Peneliti (Merdeka Belajar Kampus Merdeka - MBKM)Sitorus, Meisy Refina Lafenia-
Jan-2021Proyek Pembangunan Perluasan Gudang Boiler PT. Indofood CBP Sukses Makmur Tbk Deli SerdangArrauf-
2025Laporan Perencanaan Bangunan Rumah Tinggal pada Jalan Badik Kel. Pahlawan Medan Perjuangan dan Pengawasan Pembangunan Gedung Achmad Tahir HotelRasyid, Raihan Fachrurrozy-
2025Perencanaan Pembangunan Mushola Teknik Universitas Sumatra Utara Jl. Pasar Ii No. 35 Kelurahan Cinta Damai Kecamatan Medan Helvetia, Kota Medan, Sumatra Utara 2024 Dan Pengawasan Pengerjaan Atap Pada Mushola Teknik Universitas Sumatra Utara Jl. Perpustakaan, Padang Bulan, Kecamatan Medan Baru, Kota Medan, Sumatra Utara 2024Pohan, Ahmad Fadhil-