Please use this identifier to cite or link to this item:
https://repositori.uma.ac.id/handle/123456789/15629
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.advisor | Nurmaidah | - |
dc.contributor.advisor | Hermansyah | - |
dc.contributor.author | Saragih, Muhammad Bakri | - |
dc.date.accessioned | 2021-12-16T07:14:24Z | - |
dc.date.available | 2021-12-16T07:14:24Z | - |
dc.date.issued | 2021-09-30 | - |
dc.identifier.uri | https://repositori.uma.ac.id/handle/123456789/15629 | - |
dc.description | 76 Halaman | en_US |
dc.description.abstract | Tujuan dari Skripsi ini adalah suatu analisa perhitungan penulangan dan pendimensian pada komponen struktur balok beton bertulang. Dimana perhitungan manual pada suatu portal yang dibebani oleh beban terbagi rata dengan menggunakan Metode Cross (Hardy Cross), dan hasilnya dicek dengan menggunakan Program Komputer SAP2000 versi 14.2.2. Berdasarkan perhitungan dimensi desain struktur yang dilakukan pada “Metode Cross” penulangan balok yang paling kuat terletak pada bentang E-F dengan ukuran penampang 200 mm x 500 mm didapatkan penulangan pada tumpuan atas 9 D16 mm dan tumpuan bawah 4 D16 mm dengan begel o8 - 75 mm. Sedangkan penulangan lapangan atas 2 D16 mm dan lapangan bawah 6 D16 mm dengan begel 8 - 200 mm. Sedangkan berdasarkan perhitungan dimensi desain struktur yang dilakukan pada “SAP 2000” penulangan balok yang paling kuat terletak pada bentang E-F dengan ukuran penampang 200 mm x 500 mm didapatkan penulangan pada tumpuan atas 9 D16 mm dan tumpuan bawah 4 D16 mm dengan begel o8 - 65 mm. Sedangkan penulangan lapangan atas 2 D16 mm dan lapangan bawah 5 D16 mm dengan begel 8 -200 mm dan berdasarkan pada kondisi dilapangan/ dilokasi penelitian penulangan dengan ukuran penampang 200 mm x 500 mm penulangan pada tumpuan atas 7 D16 mm dan tumpuan bawah 5 D16 mm dengan begel 8 - 150 mm. Sedangkan penulangan lapangan atas 5 D16 mm dan lapangan bawah 7 D16 mm dengan begel 8 - 200 mm. The purpose of this thesis is an analysis of the calculation of reinforcement and dimensions of the structural components of reinforced concrete beams. Where the manual calculation on a portal that is burdened by the load is evenly distributed using the Cross Method (Hardy Cross), and the results are checked using the SAP2000 computer program version 14.2.2. Based on the calculation of the structural design dimensions carried out on the "Cross Method" the strongest beam reinforcement is located in the E-F span with a cross-sectional size of 200 mm x 500 mm, the reinforcement on the upper support is 9 D16 mm and the bottom support is 4 D16 mm with 8 - 75 mm begel. While the reinforcement for the upper field is 2 D16 mm and the lower field is 6 D16 mm with a begel 8 - 200 mm. Meanwhile, based on the calculation of the structural design dimensions carried out on "SAP 2000" the strongest beam reinforcement is located on the EF span with a cross-sectional size of 200 mm x 500 mm, the reinforcement is obtained at the top support 9 D16 mm and the bottom support 4 D16 mm with a begel 8 - 65 mm . While the reinforcement in the upper field is 2 D16 mm and the lower field is 5 D16 mm with a begel 8 -200 mm and based on the conditions in the field / research location, reinforcement with a cross-sectional size of 200 mm x 500 mm, the reinforcement on the upper support is 7 D16 mm and the lower support is 5 D16 mm with begel 8 - 150 mm. While the reinforcement for the upper field is 5 D16 mm and the lower field is 7 D16 mm with a begel 8 - 200 mm. | en_US |
dc.language.iso | id | en_US |
dc.publisher | Universitas Medan Area | en_US |
dc.relation.ispartofseries | NPM;168110047 | - |
dc.subject | analisa struktur | en_US |
dc.subject | metode cross | en_US |
dc.subject | program sap2000 | en_US |
dc.subject | perhitungan dimensi | en_US |
dc.subject | tulangan struktur | en_US |
dc.subject | structural analysis | en_US |
dc.title | Analisis Perhitungan Struktur Dengan Menggunakan SAP 2000 dan Metode Cross di Gedung Kantor Dinas Kesehatan Kota Medan | en_US |
dc.title.alternative | Structural Calculation Analysis Using SAP 2000 and the Cross Method in the Medan City Health Office Building | en_US |
dc.type | Thesis | en_US |
Appears in Collections: | SP - Civil Engineering |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
168110047 - Muhammad Bakri Saragih - Fulltext.pdf | Cover, Abstract, Chapter I,II,III,Bibliography | 7.71 MB | Adobe PDF | View/Open |
168110047 - Muhammad Bakri Saragih - Chapter IV.pdf Restricted Access | Chapter IV | 1.62 MB | Adobe PDF | View/Open Request a copy |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.