Please use this identifier to cite or link to this item: https://repositori.uma.ac.id/handle/123456789/15967
Full metadata record
DC FieldValueLanguage
dc.contributor.advisoradvisor-
dc.contributor.authorSinamo, Probahenta-
dc.date.accessioned2021-12-22T09:30:39Z-
dc.date.available2021-12-22T09:30:39Z-
dc.date.issued2020-08-27-
dc.identifier.urihttps://repositori.uma.ac.id/handle/123456789/15967-
dc.description80en_US
dc.description.abstractSeiring dengan perkembangan perekonomian di Indonesia yang semakin pesat, membuat kebutuhan akan proyek kontruksi semakin meningkat. Penjadwalan proyek merupakan salah satu elemen hasil perencanaan, yang dapat memberikan informasi tentang jadwal rencana dan kemajuan proyek, dalam hal kinerja sumber daya berupa biaya, tenaga kerja, peralatan dan material serta rencana durasi proyek dan progres waktu untuk menyelesaikan proyek. Tujuan penelitian ini adalah untuk mengetahui durasi penjadwalan waktu dan anggaran biaya yang dibutuhkan dan membandingkannya dengan durasi dan anggaran rencana di proyek. Penelitian ini menggunakan Program Microsoft Project 2010 yang hasilnya akan dimasukkan ke tabel WBS dan akan diberi nomor identifikasi di setiap masing-masing item pekerjaan. Analisa waktu dan biaya yang didapatkan dengan metode Work Breakdown Structure adalah 195 hari dengan biaya Rp.20.557.135.000. berbeda dengan hasil rencana dari proyek dengan waktu 195 hari dengan biaya Rp.20.575.334.000. sehingga didapatkan durasi sama dengan rencana di proyek sedangkan biaya dengan WBS lebih hemat Rp.18.199.000. The necessity of construction project is increased due to the rapid development of economy in Indonesia. The project scheduling is one of the planning results elements that can inform the plan schedule and project progress including the source performance, cost, workers, tools, materials, project duration plan, and progress of time to complete the project. The study goal is to investigate the time scheduling duration and cost budgeting and comparing to the project scheduling duration and cost budgeting. The research used the Microsoft Project 2010 software and WBS (Work Breakdown Structure) table as the research tool. The result of WBS method analysis shows that the time scheduling duration and cost budgeting are 195 days with the cost of Rp. 20,557,135,000 compared to the project plan result with the time scheduling duration and cost budgeting are 195 days with the cost of Rp. 20,557,334,000. Hence, the project can save Rp. 18,199,000.en_US
dc.language.isoiden_US
dc.publisherUniversitas Medan Areaen_US
dc.relation.ispartofseriesNPM;148110019-
dc.subjectjadwalen_US
dc.subjectbiayaen_US
dc.subjectwork breakdown structureen_US
dc.subjectmicrosoft projecten_US
dc.subjectschedulingen_US
dc.subjectcost budgetingen_US
dc.subjectmicrosoft projecten_US
dc.titleAnalisa Penjadwalan Waktu dan Anggaran Biaya Proyek dengan Metode Work Breakdown Structures (WBS)en_US
dc.title.alternativeAnalysis of Project Time Scheduling and Budget with Work Breakdown Structures (WBS) Methoden_US
dc.typeThesisen_US
Appears in Collections:SP - Civil Engineering

Files in This Item:
File Description SizeFormat 
148110019- Probahenta Sinamo Chapter IV.pdf
  Restricted Access
641.82 kBAdobe PDFView/Open Request a copy
148110019- Probahenta Sinamo Fulltext.pdfCover , Abstract, Chapter I,II,III, Bibliography1.57 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.