Please use this identifier to cite or link to this item: https://repositori.uma.ac.id/handle/123456789/16725
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorBahri, Zulkifli-
dc.contributor.advisorSyarif, Yance-
dc.contributor.authorToruan, Tegas Lumban-
dc.date.accessioned2022-03-29T02:57:31Z-
dc.date.available2022-03-29T02:57:31Z-
dc.date.issued2005-05-23-
dc.identifier.urihttps://repositori.uma.ac.id/handle/123456789/16725-
dc.description69 Halamanen_US
dc.description.abstractDengan semakin berkembangnya zaman pada masa sekarang ini dan semakin meningkatnya pembangunan terutama pembangunan perkantoran, pabrik pabrik, pertokoan serta perumahan sehingga sarana penerangan adalah merupakan hal yang sangat penting pada masa sekarang ini dimana sistem penerangan mempunyai peranan penting untuk menunjang suatu gedung terutama pada malam hari. Dengan penerangan yang baik maka pekerjaan akan lebih mudah diselesaikan tanpa mempengaruhi mata yang disebabkan oleh cahaya. Adapun isi dari tugas akhir tersebut penulis mengemukakan dalam bidang perhitungan nilai penerangan dan jumlah armatur yang dibutuhkan dengan judul analisa sistem penerangan pada gedung perkantoran dan produksi pt. otani medan yang terletak di jalan rumah potong hewan no 1 medan. Tujuan tugas akhir ini penulis mencoba untuk menghitung nilai penerangan yang ada pada ruangan yang terdapat pada pt. otani medan. Adapun metode yang digunakan dalam perhitungan yang pada umumnya digunakan adalah dengan menggunakan metode lumen. sedangkan metode lain jug dibahas sebahagian kecil guna melakukan perbandingan sehingga dapat ditentukan metode mana yang akan kita gunakan untuk menghitung nilai penerangan. With the development of today's era and increasing development, especially the construction of offices, factories, shops and housing so that lighting facilities are very important at this time where the lighting system has an important role to support a building, especially at night. With good lighting, work will be easier to complete without affecting the eyes caused by light. As for the contents of the final project, the author suggests that in the field of calculating the value of lighting and the number of armatures needed, the title is "analysis of lighting systems in office buildings and production of pt. otani Medan which is located on Jalan Slaughterhouse No. 1 Medan. The purpose of this final project the author tries to calculate the value of the existing lighting in the room contained in pt. field focus. The method used in the calculation which is generally used is the lumen method. while other methods are also discussed in a small part in order to make comparisons so that it can be determined which method we will use to calculate the illumination value.en_US
dc.language.isoiden_US
dc.publisherUniversitas Medan Areaen_US
dc.relation.ispartofseriesNPM;998120035-
dc.subjectgedung perkantoranen_US
dc.subjectproduksi aplikasien_US
dc.subjectsistem peneranganen_US
dc.titleAnalisis Sistem Penerangan Pada Gedung Perkantoran dan Produksi (Aplikasi PT. Otani Medan)en_US
dc.title.alternativeAnalysis of Lighting Systems in Office and Production Buildings (Application of PT. Otani Medan)en_US
dc.typeThesisen_US
Appears in Collections:SP - Electrical Engineering

Files in This Item:
File Description SizeFormat 
998120038_tegas lumban toruan.pdfPart (Fulltext Can Read on Libraries)3.39 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.