Please use this identifier to cite or link to this item: https://repositori.uma.ac.id/handle/123456789/17204
Title: Pembuatan Prototype Pembangkit Listrik Tenaga Mikro Hidro (PLMTH) Dengan Daya Maksimal 100 Watt Menggunakan Turbin Tipe Whirlpool
Other Titles: Manufacture of a Prototype of Micro Hydro Power Plant (PLMTH) with a Maximum Power of 100 Watts Using a Whirlpool Type Turbine
Authors: Silitonga, Riswan Tnto Horas
metadata.dc.contributor.advisor: Siahaan, Yusuf
Keywords: Pembuatan;Manufacture;perakitan prototype;prototype assembly;turbin whirlpool;whirlpool turbine
Issue Date: 12-Apr-2022
Publisher: Universitas Medan Area
Series/Report no.: NPM;178130087
Abstract: Listrik merupakan sebagai salah satu kebutuhan yang penting bagi masyarakat. Mikro hidro merupakan sebuah istilah yang terdiri dari kata mikro yang berarti kecil dan hidro berarti air. Secara teknis mikro hidro memiliki tiga komponen utama yaitu air sebagai sumber energi, turbin dan generator sebagai pengubah energi mekanik menjadi energi listrik. Tujuan penelitian ini yaitu untuk mengetahui proses pembuatan prototype pembangkit listrik tenaga mikro hidro (PLMTH) dengan daya maksimal 100 watt turbin tipe whirlpool, untuk membangun dan merakit prototype pembangkit listrik tenaga mikro hidro (PLMTH), menganalisis proses pembuatan pembangkit listrik tenaga mikro hidro skala laboratorium, serta menganalisis rancangan anggaran biaya (RAB) pada pembangkit listrik tenaga mikro hidro (PLMTH). Pembangkit listrik tenaga mikro hidro ini menggunakan turbin tipe whirlpool yang di mana komponennya antara lain tabung reservoir bawah, tabung reservoir atas, waterway, pintu air, tabung rumah turbin, turbin air, pompa air dan generator hasil penelitian yang di peroleh adalah proses pengerjaan prototype pembangkit listrik tenaga mikro hidro yang dimana dimulai dengan proses pembuatan kerangka besi, proses pembuatan tabung reservoir bawah, proses pembuatan tabung reservoir atas, proses pembuatan waterway, proses pembuatan tabung rumah turbin, proses pembuatan turbin air dan kemudian proses perakitan serta menganalisis rancangan anggaran biaya (RAB). Pembuatan prototype pembangkit listrik tenaga mikro hidro diawali dengan menganalisa kebutuhan, perancangan alat, pembuatan alat dan pengujian alat. Dari pengujian alat ini dapat beroperasi layaknya pembangkit listrik tenaga mikro hidro skala laboratorium dengan daya maksimum 100 watt maka dalam presentasi akhir 60-70 % kelayakan alat, sehingga dinyatakan layak sebagai mestinya dan proses pembuatan PLMTH dinyatakan selesai. Proses pembuatan prototype pembangkit listrik tenaga mikro hidro menggunakan dua proses analisis yaitu: proses analisis pengerolan tabung dan proses analisis pengelasan. Dengan mengetahui rancangan anggaran biaya (RAB) maka layak dijadikan salah satu prototype pembangkit listrik tenaga mikro hidro skala laboratorium. Electricity is one of the most important needs for society. Micro hydro is a term consisting of the words micro which means small and hydro means water. Technically, micro hydro has three main components, namely water as an energy source, turbine and generator as a converter of mechanical energy into electrical energy. The purpose of this study is to determine the process of making a prototype of a micro hydro power plant (PLMTH) with a maximum power of 100 watts of whirlpool type turbine, to build and assemble a prototype of a micro hydro power plant (PLMTH), to analyze the process of making a micro hydro power plant on a laboratory scale, as well as analyzing the draft budget (RAB) for micro hydro power plants (PLMTH). This micro hydro power plant uses a whirlpool type turbine whose components include the lower reservoir tube, upper reservoir tube, waterway, sluice gate, turbine housing tube, water turbine, water pump and generator. micro hydro power which starts with the process of making an iron frame, the process of making the lower reservoir tube, the process of making the upper reservoir tube, the process of making the waterway, the process of making the turbine house tube, the process of making a water turbine and then the assembly process and analyzing the design budget (RAB). Making a prototype of a micro hydro power plant begins with analyzing needs, designing tools, making tools and testing tools. From testing this tool can operate like a laboratory scale micro hydro power plant with a maximum power of 100 watts, in the final presentation 60-70% of the feasibility of the tool, so that it is declared feasible and the PLMTH manufacturing process is declared complete. The process of making a prototype of a micro hydro power plant uses two analytical processes, namely: the tube rolling analysis process and the welding analysis process. By knowing the design budget (RAB) it is appropriate to be used as one of the prototypes of a laboratory-scale micro hydro power plant.
Description: 44 Hal
URI: https://repositori.uma.ac.id/handle/123456789/17204
Appears in Collections:SP - Mechanical Engineering

Files in This Item:
File Description SizeFormat 
178130087 - Riswan Tanro Horas Silitonga - Chapter IV.pdf
  Restricted Access
Chapter IV621.51 kBAdobe PDFView/Open Request a copy
178130087 - Riswan Tanro Horas Silitonga - Fulltext.pdfCover, Abstract, Chapter I, II, III, V, Bibliography1.21 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.