Please use this identifier to cite or link to this item:
https://repositori.uma.ac.id/handle/123456789/18035
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.advisor | Sihombing, Marlon | - |
dc.contributor.advisor | Suryadi, Agus | - |
dc.contributor.author | Sembiring, Johanes | - |
dc.date.accessioned | 2022-08-19T08:51:55Z | - |
dc.date.available | 2022-08-19T08:51:55Z | - |
dc.date.issued | 2017-08-28 | - |
dc.identifier.uri | https://repositori.uma.ac.id/handle/123456789/18035 | - |
dc.description | 121 Halaman | en_US |
dc.description.abstract | Penelitian ini bertujuan untuk mengetahui bagaimana perencanaan pembangunan Lahan Tempat Pembuangan Akhir (TPA) Sampah di Desa Mekar iaya Kecamatan Wampu Kabupaten Langkat dan Faktor penghambat Perencanaan Pernbangunan TPA tersebut serta untuk mengetahui upaya apa yang telah dilakukan oleh instansi terkait dalam mengatasi hambatan tersebut. Jenis penelitian ini menggunakan metode kualitatif dengan pendekatan deskriptif fokus penelitian ini yaiiu bagaimana Perencanaan Pembangunan Lahan Tempat Pembuangan Akhir (TPA) Sampah dan Faktor penghambat Perencanaan Pembangunan TPA tersebut serta untuk mengetaliui upaya apa yang telah dilakukan oleh instansi terkait dalam mengatasi hambatan tersebut yang dilihat dari fokus perencnaan, partisipasi masyarakat, sinergitas perensaniutn, dan legalitas perencanaan. Sumber data primer yaitu wawancara kepada pihak terkait dan dengar pendapat pada kegiatan konsultasi publik dan sekunder dikumpulkan melalui observasi dan penelitian di lapangan. Teknis analisis data adalah model interaktif, yaitu reduksi data, penyajian dat4 dan penarikan kesimpulan. Berdasarkan hasil penelitian bahwa perencanaan pembangunan lahan tempat pembuangan akhir (TPA) sampah di Desa Mekar Jaya KecamatanWampu Kabupaten Langkat saat ini masih dalam tahap perencanaan dan penetapan lokasi. Pelaksanaan pembangUnan direncanakan pada akhir tahun 2016. Adapun yang faktor penghambat yaitu proses pembebasan lahan dan pembuatan sertifikat lahan memakan waktu yang lama. Adapun upaya yang yang telah dilaksanakan instansi terkait saat ini, yaittu Melakukan pendekatan kepada masyarakat, Mengadakan pertemuan yang melibatkan masyaraka! Meningkatkan kinerja instansi terkait dalam perencanaan pembangunan TPA, Menginformasikan setiap kegiatan perencanaan pembangunan TPA kepada masyarakat. This study aims to find out how the development planning Land Final Disposal (TPA) Garbage in the Village Meknr Jaya Wampu Distrtct Langknt and ltitbittng Factors Planning Construction of the TPA and to determine what efforts have been done by relevant agencies in overcoming these obstacles. This research uses qualitative method with descriptive approach, the focus of this research is how Planntng Land Construction Landfill gI'A) Garbage and Inhibiting Factors Planning Constntction of the TPA and to krnw whot efforts have been done by relevont agencies in overcoming these barriers which is iien from the focus of planning, community participation, planning synerg/, and legaitty of plonnrng. Primary data sources are interviews to related parties and pubttc and secondary consultation activities are collected through field observation ond research. Technical data arnlysis is an interactive model, ie data reduction, data presenlation, and conclusion. Based on the results of research that the planning of landfill landfill (IPA) in the village of Mefor Jaya KecamatanWampu Langkat district is still in the planning and determining the location Implementation of development is planned ot the end of 2016. As for the inhibitingfactors namely the process -land 9f acquisition and the making of land certificate takes a long time. As for the efforts that have been implemented by the relevant agerrcies at this time, yaittu ipproach to the community, Con&rcting rneetings itwolving the community, I*prore the pedormarrce of relevant agencies in the planning of landfill consrnrction, Infortn every activity planntng of landfill construction to the community. | en_US |
dc.language.iso | id | en_US |
dc.relation.ispartofseries | NPM;151801061 | - |
dc.subject | perencanaan pembangunan TPA | en_US |
dc.subject | Planning of landfill construction | en_US |
dc.title | Analisis Perencanaan Pembangunan Lahan Tempat Pembuangan Akhir (Tpa) Sampah di Desa Mbkar Jaya Kecamatan Wampu Kabupaten Langkat | en_US |
dc.title.alternative | Analysis of Land Development Planning for Waste Final Disposal (Tpa) in Mbkar Jaya Village, Wampu District, Langkat Regency | en_US |
dc.type | Tesis Magister | en_US |
Appears in Collections: | MT - Master of Public Administration |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
151801061 - Johanes Sembiring - Fulltext.pdf | Cover, Abstract, Chapter I,II,III,V Bibliography | 5.47 MB | Adobe PDF | View/Open |
151801061 - Johanes Sembiring - Chapter IV.pdf Restricted Access | Chapter IV | 4.85 MB | Adobe PDF | View/Open Request a copy |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.