Please use this identifier to cite or link to this item: https://repositori.uma.ac.id/handle/123456789/18499
Full metadata record
DC FieldValueLanguage
dc.contributor.authorBrahmana, Ebigael Jovanka Br-
dc.date.accessioned2022-11-24T05:08:09Z-
dc.date.available2022-11-24T05:08:09Z-
dc.date.issued2022-09-21-
dc.identifier.urihttps://repositori.uma.ac.id/handle/123456789/18499-
dc.description72 Halamanen_US
dc.description.abstractKeterlambatan merupakan hal yang sering terjadi dalam pekerjaan konstruksi dan menimbulkan kerugian bagi pelaku konstruksi. Keterlambatan dapat disebabkan oleh berbagai faktor diantaranya faktor internal (pelaku konstruksi), faktor eksternal (diluar pelaku konstruksi), dan faktor lainnya (seperti bencana alam, faktor manajemen, faktor material, faktor lingkungan). Keterlambatan juga terjadi pada proyek Pembangunan Jembatan Gantung Bangun Jawa I Kabupaten Serdang Bedagai, sehingga dilakukan penelitian untuk mengevaluasi keterlambatan proyek dari segi biaya dan waktu. Maksud dari penelitian ini adalah untuk mengevaluasi schedule rencana dan schedule pelaksanaan proyek Pembangunan Jembatan Gantung Bangun Jawa I Kabupaten Serdang Bedagai. Tujuan dari penelitian ini adalah untuk mengetahui perkiraan biaya (EAC) dan perkiraan waktu (EAS) yang dibutuhkan untuk menyelesaikan proyek dan untuk mengetahui penyebab keterlambatan proyek Pembangunan Jembatan Gantung Bangun Jawa I Kabupaten Serdang Bedagai. Penelitian diharapkan dapat menjadi bahan rujukan / referensi / bentuk sumbangsih saran bagi para pelaku konstruksi guna antisipasi terjadinya keterlambatan pada pekerjaan konstruksi lainnya. Evaluasi dilakukan menggunakan metode Earned Value Management. Berdasarkan evaluasi diperoleh hasil bahwa pelaksanaan proyek cenderung lambat namun biaya pelaksanaan masih berada di bawah anggaran dengan perkiraan biaya Rp. 2,454,274,500,- (belum termasuk uang muka yang diberikan di awal pelaksanaan pekerjaan) dan perkiraan waktu 36 minggu untuk menyelesaikan proyek. Adapun keterlambatan yang terjadi disebabkan oleh adanya proses justifikasi teknik, keterlambatan pengiriman rangka jembatan dan cash flow penyedia jasa yang tidak stabil. Delay is something that often happens in work and causes losses for construction worker. Delays can be caused by various factors including internal factors (construction worker), external factors (outside construction worker), and other factors (such as natural disasters, management factors, material factors, environmental factors). Delays also occurred in the Construction of Java I Suspension Bridge Construction Project, Serdang Bedagai Regency, so research was carried out to delay the project in terms of cost and time. The purpose of this research is to evaluate plan and schedule the implementation of the Construction of Java I Suspension Bridge Construction Project, Serdang Bedagai Regency. The purpose of this research was to determine the estimated cost (EAC) and estimated time (EAS) required to complete the project and to find out the cause of the delay in the construction of the Construction of Java I Suspension Bridge Construction Project, Serdang Bedagai Regency. The research is expected to be a reference material / reference / form of advice contribution for worker to anticipate delays in other construction works. Evaluation is carried out using the Earned Value Management method. Based on the evaluation, it was found that project implementation tends to be slow but the cost of implementation is still below with estimated cost of Rp. 2,454,274,500,- (not including the down payment given at the beginning of the work) and an estimated time of 36 weeks to complete the project. The delays that occurred were caused by the technical justification process, delays in the delivery of bridge frames and unstable cash flow of service providers.en_US
dc.language.isootheren_US
dc.publisherUniversitas Medan Areaen_US
dc.relation.ispartofseriesNPM;208110079-
dc.subjectketerlambatan proyeken_US
dc.subjectbiayaen_US
dc.subjectwaktuen_US
dc.subjectearned value managementen_US
dc.subjectdelaysen_US
dc.subjectprojecten_US
dc.titleEvaluasi Keterlambatan Proyek Pembangunan Jembatan Gantung Bangun Jawa I Kabupaten Serdang Bedagaien_US
dc.title.alternativeEvaluation of Delays in the Construction of the Jawa I Suspension Bridge Construction Project, Serdang Bedagai Regencyen_US
dc.typeThesisen_US
Appears in Collections:SP - Civil Engineering

Files in This Item:
File Description SizeFormat 
208110079 - Ebigael Jovanka Br. Brahmana - Chapter IV.pdf
  Restricted Access
Chapter IV1.16 MBAdobe PDFView/Open Request a copy
208110079 - Ebigael Jovanka Br. Brahmana - Fulltext.pdfCover, Abstract, Chapter I, II, III, V, Bibliography2.91 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.