Please use this identifier to cite or link to this item: https://repositori.uma.ac.id/handle/123456789/19048
Full metadata record
DC FieldValueLanguage
dc.contributor.authorMuchtar, Tengku Azhar-
dc.date.accessioned2022-12-27T08:42:21Z-
dc.date.available2022-12-27T08:42:21Z-
dc.date.issued2022-11-18-
dc.identifier.urihttps://repositori.uma.ac.id/handle/123456789/19048-
dc.description71 Halamanen_US
dc.description.abstractMembeludaknya kendaraan terutama pada kota Medan hingga mengakibatkan beberapa simpang dan juga jalan mengalami kemacetan lalu lintas. Tugas akhir ini mengulas hubungan antar panjang antrian dengan tundaan pada persimpangan Rumah Sakit Siti Hajar. Dilihat hubungan antara panjang antrian dengan tundaan yang diperoleh dipersimpangan Rumah Sakit Siti Hajar menggunakan metode pendekatan dan berpacu pada MKJI 1997. Setelah dilakukan perhitungan di ketahui bahwa jumlah antrian tertinggi terjadi pada jalan Jamin Ginting sebesar 175 m dan dengan antrian yang sebesar itu maka secara langsung juga berpengaruh terhadap tundaannya yang sebesar 51,495 det/smp sehingga dapat disimpulkan bahwa semakin tinggi antrian maka akan menyebab tundaan semakin besar pula.Untuk lebih memerhatikan fase yang sesuai pada setiap lengan jalan agar disesuaikan dengan jumlah kendaraan yang melewati jalan tersebut diberikan sangsi yang tegas kepada para pengusaha bengkel motor yang ada di jalan Jamin Ginting agar tidak menggunakan lengan jalan untuk dijadikan parkiran motor yang belum diservis. The increase in vehicles, especially in the city of Medan, has resulted in several intersections and roads experiencing traffic jams. What will be reviewed in this paper is the relationship between queue length and delay at the intersection of Siti Hajar Hospital. Looking at the relationship between the length of the queue and the delay obtained at the intersection of Siti Hajar Hospital, using the approach and racing method at MKJI 1997. After calculations, it was found that the highest number of queues occurred on Jalan Jamin Gintting of 175 m and with such a large queue, directly also affects the delay which is 51.495 sec/pcu so it can be concluded that the higher the queue, the bigger the delay. To pay more attention to the appropriate phase on each arm of the road so that it is adjusted to the number of vehicles that pass through the road, strict sanctions are given to the drivers. motorcycle repair shop entrepreneurs on Jalan Jamin Ginting so as not to use the road arm to be used as a motorcycle parking lot that has not been serviced.en_US
dc.language.isootheren_US
dc.publisherUniversitas Medan Areaen_US
dc.relation.ispartofseriesNPM;168110067-
dc.subjectdelaysen_US
dc.subjectvehicle queuesen_US
dc.subjectsignalized intersectionsen_US
dc.subjectmkji 1997en_US
dc.subjecttundaanen_US
dc.subjectantrian kendaraanen_US
dc.subjectsimpang bersinyalen_US
dc.titleAnalisa Panjang Antrian Dengan Tundaan Di Simpang Rumah Sakit Siti Hajar Medanen_US
dc.title.alternativeAnalysis of Queue Length with Delays at the Siti Hajar Hospital Intersection, Medanen_US
dc.typeThesisen_US
Appears in Collections:SP - Civil Engineering

Files in This Item:
File Description SizeFormat 
168110067 - Tengku Azhar Muchtar - Fulltext.pdfCover, Abstract, Chapter I, II, III, V, Bibliography864.36 kBAdobe PDFView/Open
168110067 - Tengku Azhar Muchtar - Chapter IV.pdf
  Restricted Access
Chapter IV557.1 kBAdobe PDFView/Open Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.