Please use this identifier to cite or link to this item: https://repositori.uma.ac.id/handle/123456789/20141
Title: Perencanaan dan Pengawasan Produksi pada Koperasi Pengusaha Pengrajin Sepatu Medan
Other Titles: Production Planning and Supervision at the Medan Shoe Craftsmen Cooperative
Authors: Girsang, Joskar
metadata.dc.contributor.advisor: Hardy, Jhon
Supraningsih, Winarni
Keywords: perencanaan dan pengawasan produksi;production planning and control
Issue Date: 12-Feb-2000
Publisher: Universitas Medan Area
Series/Report no.: NPM;948300161
Abstract: Kesimpulan 1. Koperasi Pengusaha Pengrajin Sepatu Medan merupakan Perusahaan sepatu yang bergerak dalam bidang industri 2. Perencanaan produksi yang dilaksanakan oleh koperasi bertujuan untuk mengarahkan agar kegiatan proses produksi dalam koperasi ini dapat berjalan sesuai dengan yang ditargetkan oleh koperasi. 3. Dalam melaksanakan perencanaan produk.si, koperasi membutuhkan suatu pengawasan yang baik dan tepat agar tujuan yang diharapkan dapat tercapai. 4. Pengawasan produksi yang dilakukan oleh koperasi adalah pengawasan bahan baku, pengawasan proses produksi, penga 3 asan m.utu dan pengawasan mesin (jam kerja mesin). 5. Koperasi belum mampu mempromosikan produknya dan belum menggunakan transportasi secara tepat, sehingga barang yang dihasilkan tidak sampai pada waktu yang ditentukan. Conclusion 1. The Medan Shoe Craftsmen Cooperative is a shoe company engaged in the industrial sector 2. Production planning carried out by the cooperative aims to direct the activities of the production process in this cooperative to run according to what is targeted by the cooperative. 3. In carrying out production planning, cooperatives need good and proper supervision so that the expected goals can be achieved. 4. Production supervision carried out by the cooperative is raw material supervision, production process supervision, quality assurance and machine supervision (machine working hours). 5. Cooperatives have not been able to promote their products and have not used transportation properly, so that the goods produced do not arrive at the specified time.
Description: 54 Halaman
URI: https://repositori.uma.ac.id/handle/123456789/20141
Appears in Collections:SP - Management

Files in This Item:
File Description SizeFormat 
948300161 - Joskar Girsang - Fulltext.pdfCover, Abstract, Chapter I, II, III, V, Bibliography4.78 MBAdobe PDFView/Open
948300161 - Joskar Girsang - Chapter IV.pdf
  Restricted Access
Chapter IV627.15 kBAdobe PDFView/Open Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.