Title: Perencanaan Elevator pada Gedung Tingkat Enam
Other Titles: Elevator Planning on Sixth Floor Buildings
Authors: Siagian, Leonardo
metadata.dc.contributor.advisor: Ibrahim, Husin
Amrinsyah
Keywords: elevator;gedung tingkat enam;sixth floor buildings
Issue Date: 2007
Publisher: Universitas Medan Area
Series/Report no.: NPM;018130047
Abstract: Elevator adalah• pesawat pengangkst yang berfungsi untuk mengangknt suatu benda I orang dari suatu teni1>at ketcmpat yang lain dalam arah vertikal. Elevator memiliki daerah operasi secara vcrtikal yang di scbut panjang lintasan, yang artinya daerah operasinya dibatasi dengan tinggi angkat dari dasar lanti sampai tinggi pengangkatan maksimum. Elevator terdiri dari bcberapa bagian yakni kabin, kawat/kabcl, aiat pengontrol, rel, rumab ventilasi dan terowongan. Pesawat angkat elevator terdiri beberapa jenis yaitu • Elevator pengangkat penumpang • Elevator pengangkat barang -> • Elevator yang direncanakan ini adalah elevator yang di gunakan pada gedung untuk mengangkat μenumpang. Elevator penumpang ini di rencanal1;an mampu mengangkat lJeban penumpang 12 orang, bHa beratnya 1 orang penumpang + 75 kg maka beban yang akan diangkat elevator penum11ang ini dalam satu kali pengangkatan adalah 12 x 75 900 kg. Sedangkan kabin yang terbuat dari bahan-bahan aluminium, tri11ICk, kaca, ambal, besi tuang, yang berukuran 1,75m x 1,50m x 2,25m yang berbobot 350 kg direncanakan mampu diangkat elevatl/lr ini. Untuk menjamin elemen-elemen pesawat dari kelelahan akibat pemakaian berulang-ulang diambil dari faktor koreksi (fc) 1,2 maka dalam perencanaan ini daya angkat maksimum dri pesawat angkatadalah (900+350) x 1,2 = 1500 kg. Tinggi anglrnt yang ingin direncanakan 25m kecepatan angkat 15m/men, putaran motor 800 rpm. Dalam perencanaan pesawat pengangkat ini, jenis tali pcngangkat yang digunakan adalah tali baja. Tali baja sangat umum di gunakan pada pesawat pengangkat, jika di bandingkan dengan jenis tali lain. Ukur.an tali baja yang di gunakan adalah 6 x 37 + 1 fc, sud dari tipe ini adalah 6 golongan, dimana tiap-tiap gulungan (pintalan) kecil terdiri dari 37 kawat baja yang kecil, sedangkan fc (fiber core) berfungsi agar tali lemas dan flekEiel. Dari hasil perhitungan, tali baja yang digunakan selama kurang lebih 28 bulan. Elevator is functioning lifting equipment to lift an object/people from a place to other place in vertical direction. Elevator have area operate for vertically which mentioning path length, with the meaning its operation area limited highly lift from base dance high until maximum lifting. Elevator consist of some part namely cabin, strand of metal I cable, comptroller, rel , house ventilate and tunnel; cutting. Plane lift elevator compose some type that is: ).>- Jacking elevator of passenger. ).>- Redcap elevator. >- Planned elevator is elevator which in using building to lift passenger. This Passenger elevator in planning can lift passenger burden 12 people, if/when wt. 1 passenger people + 75 singk hence burden to be lifted this passenger elevator in once lifting 12 x 75.900 singk. While made cabin of aluminium materialss, triplek, glass, ambal , iron decant, fairish 1,75 x m 1,50 x m 2,25 heavy m 350 singk planned can be lifted by this elevator. To guarantee plane elements of fatigue effect of usage repeatedly taken away from corrective factor ( fc) 1,2 hence in the plan this energy lift mc.ximum plane dri lift [is] ( 900+350) x 1,2 = 1500 singk. High lift which wish to be planned 25 speed m lift 15m I men, motor rotation 800 rpm, In the plan this lifting equipment, jacking string type the used steel string. String become militant very common/ public using lifting equipment, if comparing with other string type. String steel size measure which using 6 x 37 + 1 fe, sud of this type 6 faction, where every roll (small cord) consist of 37 small steel strand of metal, while fc (core fiber) functioning string to weaken and flexible. Than result of calculation, used steel string during more or less 28 months.
Description: 71 Halaman
URI: https://repositori.uma.ac.id/handle/123456789/21058
Appears in Collections:SP - Mechanical Engineering

Files in This Item:
File Description SizeFormat 
018130047 - Leonardo Siagian - Fulltext.pdfCover, Abstract, Chapter I, II, III, V, Bibliography2.18 MBAdobe PDFView/Open
018130047 - Leonardo Siagian - Chapter IV.pdf
  Restricted Access
Chapter IV1.61 MBAdobe PDFView/Open Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.