dc.contributor.authorSyahputra, Bambang Andi-
dc.date.accessioned2023-09-22T02:00:04Z-
dc.date.available2023-09-22T02:00:04Z-
dc.date.issued2008-
dc.identifier.urihttps://repositori.uma.ac.id/handle/123456789/21194-
dc.description63 Halamanen_US
dc.description.abstractDalam pelaksanaan di proyek, maka peran manajemen konstruksi untuk keberhasilan sebuah proyek. Mencapai hasil pekerjaan yang bemmtu baik, penyelesaian pekerjaan yang lebih cepat dari waktu penyelesaian yang ditetapkan, serta terjadi penghematan biaya pelaksanaan pekerjaan, merupakan harapan setiap perusahaan konstruksi atau orang yang berperan aktif didalamnya. Untuk mewujudkan hal tersebut, maka penerapan metode pelaksanaan yang baik dapat rnempengaruhi durasi pelaksanaan pekerjaan. Metode pelaksanaan dan durasi pelaksanaan pekerjaan merupakan dua hal yang memegang peranan pcnting dalani setiap pengelolaan proyek, dimana keduanya berfungsi sebagai panduan pelaksanaan pekerjaan. Di sisi lain metode pelaksanaan dan durasi pelaksanaan pekerjaan atau yang umum disebut Penjadwalan Kerja (TL'lle Schedule), juga sudah menjadi syarat tersendiri didalam penawaran harga proyek (Tender Proyek), dan bahkan mempunyai bobot penilaian yang cukup tinggi, sehingga sangat menentukan dalam pemenangan pelelangan (tender). Dalam menerapkan metode . pelaksanaan yang benar menyebabkan pelaksanaan pekerjaan lebih efektif dan terarah sesuai dengan urutan-urutan yang benar, sehingga memberikan pengaruh terhadap durasi pelaksanaan pekerjaan. In project implementation, the role of construction management is to success of a project. Achieving good quality work results, completion of work faster than the stipulated completion time, as well as savings in work implementation costs, is everyone's hope construction companies or people who play an active role in them. For to realize this, then implementing good implementation methods can Affects the duration of work implementation. The method of implementation and duration of work implementation are two things who plays an important role in every project management, where both serves as a guide for work implementation. On the other hand, the implementation method and the duration of work implementation or what is commonly called Work Scheduling (TL'lle Schedule), has also become a separate requirement in the project price offer (Project Tender), and even has a fairly high assessment weight, so it is very decisive in winning the auction (tender). In applying the method. Correct implementation causes the implementation of work is more effective and directed in accordance with certain sequences correct, thus having an influence on the duration of work implementation.en_US
dc.language.isoiden_US
dc.publisherUniversitas Medan Areaen_US
dc.relation.ispartofseriesNPM;008110006-
dc.subjectmetode pelaksanaan pekerjaanen_US
dc.subjectdurasi pekerjaan proyeken_US
dc.subjectmethod of carrying out worken_US
dc.subjectduration of project worken_US
dc.titlePengaruh Metode Pelaksanaan Pekerjaan terhadap Durasi Pekerjaan Proyek Puskopau Lanud Medan (Studi Kasus)en_US
dc.title.alternativeThe Influence of Work Implementation Methods on the Duration of Work on the Medan Air Base Puskopau Project (Case Study)en_US
dc.typeSkripsi Sarjanaen_US
Appears in Collections:SP - Civil Engineering

Files in This Item:
File Description SizeFormat 
008110006 - Bambang Andi Syahputra - Fulltext.pdfCover, Abstract, Chapter I, II, III, V, Bibliography3.59 MBAdobe PDFView/Open
008110006 - Bambang Andi Syahputra - Chapter IV.pdf
  Restricted Access
Chapter IV1.22 MBAdobe PDFView/Open Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.