Please use this identifier to cite or link to this item:
https://repositori.uma.ac.id/handle/123456789/21763
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.advisor | Hermansyah | - |
dc.contributor.advisor | Suranto | - |
dc.contributor.author | Sihombing, Hakim Armando Benny | - |
dc.date.accessioned | 2023-11-01T08:16:46Z | - |
dc.date.available | 2023-11-01T08:16:46Z | - |
dc.date.issued | 2023-07-20 | - |
dc.identifier.uri | https://repositori.uma.ac.id/handle/123456789/21763 | - |
dc.description | 94 Halaman | en_US |
dc.description.abstract | Pondasi tiang atau disebut juga pondasi dalam dipergunakan untuk konstruksi beban berat (high risebuilding). Sebelum melaksanakan suatu pembangunan konstruksi yang pertama dikerjakan dilapangan adalah pekerjaan pondasi (struktur bawah). Pondasi merupakan suatu pekerjaan yang sangat penting dalam suatu pekerjaan teknik sipil, karena pondasi inilah yang memikul dan menahan suatu beban yang bekerja diatasnya yaitu beban konstruksi atas. Tujuan dari Penelitian ini untuk menghitung daya dukung bored pile dari hasil sondir dan menghitung penurunan yang terjadi pada bored pile. Pada perhitungan daya dukung bored pile dilakukan dengan menggunakan metode Meyerhoff dan untuk perhitungan penurunan bored pile dilakukan dengan menggunakan metode Vesic. Berdasarkan data sondir hasil perhitungan daya dukung bored pile sebesar 426.86 ton dengan besar daya dukung ijinnya 138.52 ton. Perencanaan pondasi tiang juga memperhitungkan besar penurunan tiang. Penurunan tiang tunggal sebesar 0.02m dan penurunan tiang yang diijinkan sebesar 0.05m. Pile foundations or also called deep foundations are used for heavy-load construction (high risebuilding). Before carrying out a construction, the first thing to do in the field is the foundation work (substructure). The foundation is a very important job in a civil engineering work, because it is this foundation that carries and holds a load that works on it, namely the top construction load. The purpose of this study is to calculate the carrying capacity of the bored pile from the sondir results and calculate the decrease that occurs in the bored pile. The calculation of the carrying capacity of the bored pile is carried out using the Meyerhoff method and the calculation of the bored pile settlement is carried out using the Vesic method. Based on sondir data, the calculation result of bored pile bearing capacity is 426.86 tons with a permit carrying capacity of 138.52 tons. Pile foundation planning also takes into account the magnitude of the pile settlement. The single pile settlement is 0.02m and the allowable pile settlement is 0.05m. | en_US |
dc.language.iso | id | en_US |
dc.publisher | Universitas Medan Area | en_US |
dc.relation.ispartofseries | NPM;198110105 | - |
dc.subject | Pile Foundation Bearing Capacity | en_US |
dc.subject | Meyerhoff | en_US |
dc.subject | Vesic | en_US |
dc.subject | Daya Dukung Pondasi Tiang Pancang | en_US |
dc.title | Analisis Pondasi Bored Pile Pada Jembatan Aek Pea Rihit Di Kabupaten Tapanuli Utara | en_US |
dc.title.alternative | Analysis of Bored Pile Foundations on Bridges Aek Pea Rihit in North Tapanuli Regency | en_US |
dc.type | Thesis | en_US |
Appears in Collections: | SP - Civil Engineering |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
198110105 - Hakim Armando Benny Sihombing - Chapter IV.pdf Restricted Access | Chapter IV | 386.42 kB | Adobe PDF | View/Open Request a copy |
198110105 - Hakim Armando Benny Sihombing - Fulltext.pdf | Cover, Abstract, Chapter I, II, III, V, Bibliography | 2.51 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.