Please use this identifier to cite or link to this item: https://repositori.uma.ac.id/handle/123456789/22111
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorRahmadsyah-
dc.contributor.authorSitanggang, Liberty Alvonso-
dc.date.accessioned2023-11-27T05:44:32Z-
dc.date.available2023-11-27T05:44:32Z-
dc.date.issued2023-08-04-
dc.identifier.urihttps://repositori.uma.ac.id/handle/123456789/22111-
dc.description84 Halamanen_US
dc.description.abstractStruktur bangunan terdiri dari struktur atas yang terletak di atas permukaan tanah dan struktur bawah yang terletak di bawah permukaan tanah. Pada Proyek Pembangunan PMKS PT. Kutai Sawit Mandiri menggunakan struktur baja. Mengingat pentingnya fungsi penampang baja pada penampang struktur, maka perlu dilakukan analisa dan perancangan penampang baja yang sesuai untuk elemen struktur kolom dan balok baja pada Proyek Pembangunan PMKS PT. Kutai Sawit Mandiri. Analisis struktur ini bertujuan untuk merancang struktur baja berdasarkan beban dan gaya kerja. Dalam penulisan tugas akhir ini digunakan metode penelitian berdasarkan topik penelitian proyek dengan menggunakan metode studi kasus. Metode studi kasus ini meninjau dan merencanakan kembali objek penelitian sesuai dengan kondisi bangunan yang mewakili objek penelitian. Tata letak struktur bangunan dianalisis menggunakan software perhitungan struktur berbasis komputer, SAP2000 v.14 yang mengacu pada SNI 1729-2020 tentang Tata Cara Perencanaan Struktur Baja Bangunan Gedung dan SNI 1726:2021 Tata Cara Perencanaan Ketahanan Gempa Struktur bangunan gedung dan non bangunan serta SNI 1727:2020 Beban minimum untuk perencanaan bangunan gedung dan struktur lainnya serta Peraturan Pembebanan Bangunan Gedung Indonesia (PPIUG 1981). Setelah dilakukan analisa struktur baja pada Proyek Pembangunan PMKS PT. Kutai Sawit Mandiri, hasil dari analisa menggunakan program SAP 2000 v14, bangunan dengan tinggi kolom 20 m, lebar bangunan 54 m dan memiliki bentang 100 m yang terdiri dari kolom WF 300 X 150, balok IFW 150 X 75, rafter IWF 300 X 150, dan gording CNP 125 x 50, dapat memikul beban yang ada. Hal ini telah dibuktikan dengan yang menunjukan semua elemen struktur berwarna biru atau berada pada angka 0,00-0,50, untuk analisis perhitungan struktur gording CNP125x50x25x2,3 diperoleh beban mati sebesar 12,21 kg/m², beban hidup air hujan sebesar 43,03 kg/m², dan beban angin tekan sebesar -12 kg/m², angin hisap sebesar -16 kg/m², Rafter WF300x150x6,5x9 diperoleh beban mati sebesar 44,05 kg/m, beban hidup sebesar 5,52 kg/m, balok WF 150 x 75 x 5 x 7diperoleh beban mati sebesar 63,53 kg/m, beban hidup sebesar 28,37 kg/m. Untuk perhitungan kolom WF 300x150x6x9 diperoleh momen max 11008 kg.cm, gaya geser 4403 kg, gaya aksial 4255 kg menggunakan tegangan izin The building structure consists of an upper structure located above ground level and a lower structure located below ground level. In the PT. PMKS Development Project. Kutai Sawit Mandiri uses a steel structure. Considering the importance of the function of steel sections in structural cross-sections, it is necessary to analyze and design appropriate steel sections for steel column and beam structural elements in the PT PMKS construction project. Kutai Sawit Mandiri. This structural analysis aims to design steel structures based on loads and working forces. In writing this final assignment a research method was used based on the project research topic using the case study method. This case study method reviews and re-plans the research object according to the condition of the building that represents the research object. The layout of the building structure was analyzed using computer-based structural calculation software, SAP2000 v.14 which refers to SNI 1729-2020 concerning Procedures for Planning Steel Structures of Buildings and SNI 1726:2021 Procedures for Planning for Earthquake Resistance of building and non-building structures and SNI 1727 :2020 Minimum loads for planning buildings and other structures as well as the Indonesian Building Loading Regulations (PPIUG 1981). After analyzing the steel structure on the PT PMKS Construction Project. Kutai Sawit Mandiri, results of analysis using the SAP 2000 v14 program, a building with a column height of 20 m, a building width of 54 m and a span of 100 m consisting of WF 300 X 150 columns, IFW 150 X 75 beams, IWF 300 and CNP 125 x 50 curtains, can support the existing load. This has been proven by showing that all structural elements are blue or are at 0.00-0.50. For the structural calculation analysis of CNP125x50x25x2.3 curtains, the dead load is 12.21 kg/m², the live rainwater load is 43, 03 kg/m², and compressed wind load of -12 kg/m², suction wind of -16 kg/m², Rafter WF300x150x6.5x9 obtained a dead load of 44.05 kg/m, live load of 5.52 kg/m, beam WF 150 x 75 x 5 x 7 obtained a dead load of 63.53 kg/m, live load of 28.37 kg/m. For the calculation of the 300x150x6x9 WF column, the maximum moment is 11008 kg.cm, the shear force is 4403 kg, the axial force is 4255 kg using the allowable stress.en_US
dc.language.isoiden_US
dc.publisherUniversitas Medan Areaen_US
dc.relation.ispartofseriesNPM;198110076-
dc.subjectStructureen_US
dc.subjectSteelen_US
dc.subjectAnalysisen_US
dc.subjectSAP2000 Constructionen_US
dc.subjectsnien_US
dc.subjectppiugen_US
dc.subjectstruktur bajaen_US
dc.subjectanalisaen_US
dc.subjectkontruksi sap2000en_US
dc.titleAnalisis Struktur Rangka Baja Pada Proyek Pembangunan PMKS PT. Kutai Sawit Mandirien_US
dc.title.alternativeAnalysis of Steel Frame Structure in PT PMKS Construction Project. Kutai Sawit Mandirien_US
dc.typeThesisen_US
Appears in Collections:SP - Civil Engineering

Files in This Item:
File Description SizeFormat 
198110076 - Liberty Alvonso Sitanggang - Fulltext.pdfCover, Abstract, Chapter I, II, III, V, Bibliography2.01 MBAdobe PDFView/Open
198110076 - Liberty Alvonso Sitanggang - Chapter IV.pdf
  Restricted Access
Chapter IV1.19 MBAdobe PDFView/Open Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.