Please use this identifier to cite or link to this item:
https://repositori.uma.ac.id/handle/123456789/22398
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.advisor | - | - |
dc.contributor.author | Febrianty, Rini | - |
dc.date.accessioned | 2023-12-15T05:10:01Z | - |
dc.date.available | 2023-12-15T05:10:01Z | - |
dc.date.issued | 2012 | - |
dc.identifier.uri | https://repositori.uma.ac.id/handle/123456789/22398 | - |
dc.description | 54 Halaman | en_US |
dc.description.abstract | Proyek adalah suatu rangkaian kegiatan yang dikerjakan dalam waktu terbatas meggunakan sum.her daya tertentu dengan harapan untuk memperoleh hasil yang terbaik pada waktu yang akan datang. Sumber daya merupakan faktor penentu dalam keberhasilan suatu proyek konstuksi perumahan. Tenaga kerja yang baik sangat diperlukan untuk keberhasilan proyek konstruksi. Kerajinan tenaga kerja akan sangat berpengaruh juga terhadap besarnya keuntugan atau kerugian suatu proyek. Penelitian ini merupakan penelitian yang dilakukan langsung meninjau atau mengamati pekerjaan konsruksi tersebut dilokasi proyek. Penelitian ini dilakukan untuk menambah wawasan dan pengetahuan baik bagi kontraktor maupun mahasiswa dalam mengatasi masalah - masalah yang timbul dilapangan akibat komponen - komponen yang mempengaruhi proyek konstruksi yang kurang efektif dan produktif. Komponen - komponen tersebut antara lain yaitu: konsultan, kontaktor, mandor, tukang, dan pembantu tukang. Masalah yang akan diteliti dalam penelitian ini adalah pegukuran pengalaman kinerja tukang pada suatu proyek yang dapat mempengaruhi tingkat keberhasilan pelaksanaan proyek tersebut. Maka yang menjadi permasalahan adalah Bagaimana menentukan berpengalaman tidaknya seorang tukang yang sekaligus sebagai indikator pengalaman kerja. Apabila kinerja tukangnya meningkat dan volume pekerjaannya meningkat maka upah kerja yang akan diterima pun akan tinggi pula dan begitu juga sebaliknya apabila kinerja tukangnya menurun dan kuantitas pekerjaannya turun maka upah kerja yang diterima juga akan rendah. Nilai rata -rata kinerja tukang yang diperoleh dari penelitian di lapangan pada pekerjaan pemasangan batu bata yaitu 3,86m2/jam setara 27 m2/hari. Maka berdasarkan data yang diteliti dilapangan, bahwa pekerja ( tukang) yang mempunyai produktifitas paling besar adalah kelompok tukang yang mempunyai pengalaman kerja >10 tahun yaitu R produktifitas = 9,43m2/hari disbanding dengan kelompok tukang yang mempunyai pengalaman kerja 1-5 tahun dan 5-lOtahun rata - rata R produktifitasnya adalah 6, 7 m2/hari dan 8,418 m2/hari. The project is a series of activities undertaken within a limited time you maintain a The project is a series of activities carried out within a limited time you maintain certain resources in the hope of obtaining the best results in the future. Resources is a decisive factor in the success of a project konstuksi housing. Good labor is indispensable to the success of construction projects. Craft labor will greatly affecting the magnitude Profit or loss on a project. This research is conducted directly or observe work konsruksi reviewing the project location. Research is underway to add insight and knowledge for both contractors and students in addressing problems - problems that arise in the field due to the component - component that affects construction projects in an effective and productive. Components - these components were: consultants, contactors, foremen, carpenters, builders and servants. Issues that will be examined in this study is experience performance experience on a project that can affect the success of the project. So the problem is How to determine whether a seasoned craftsman as well as an indicator of work experience. If the builder performance increases and volume increases, the wage job that would be acceptable would be high as well, and vice versa if the builder performance decreases and the quantity of work down the wages earned will also be low. Value - average handyman performance obtained from research in the field installation of brick work ie 3.86 m2 I h equivalent to 27 m 2 I day. So based on the data observed in the field, that workers (carpenters) that have the greatest productivity is a group of builders who have work experience> 10 years is Rproductivity = 9.43 m 2 I day compared with a group of builders who have work experience of 1-5 years and 5-10 years average - average Rproductivity was 6.7 m 2 I day and 8.418 m 2 I day. | en_US |
dc.language.iso | id | en_US |
dc.publisher | Universitas Medan Area | en_US |
dc.relation.ispartofseries | NPM;078110025 | - |
dc.subject | proyek | en_US |
dc.subject | kinerja tukang | en_US |
dc.subject | project | en_US |
dc.subject | performance handyman | en_US |
dc.title | Analisa Kinerja Tukang Batu pada Proyek Konstruksi Menurut Pengalaman Kerja | en_US |
dc.title.alternative | Analysis of Bricklayer Performance on Construction Projects According to Work Experience | en_US |
dc.type | Skripsi Sarjana | en_US |
Appears in Collections: | SP - Civil Engineering |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
078110025 - Rini Febrianty - Fulltext.pdf | Cover, Abstract, Chapter I, II, III, V, Bibliography | 1.92 MB | Adobe PDF | View/Open |
078110025 - Rini Febrianty - Chapter IV.pdf Restricted Access | Chapter IV | 2.02 MB | Adobe PDF | View/Open Request a copy |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.