Please use this identifier to cite or link to this item: https://repositori.uma.ac.id/handle/123456789/22469
Title: Turbin Air Penggerak Generator Listrik pada PLTA Sipan Sihaporas Sibolga
Other Titles: Water Turbine Driving Electric Generator at Sipan Sihaporas Sibolga Hydroelectric Power Plant
Authors: Roestamaji, Heru
metadata.dc.contributor.advisor: Nasution, Amirsyam
Darianto
Keywords: turbin air penggerak generator listrik;plta sipan sihaporas sibolga;water turbine driving an electric generator;Sipan Sihaporas Sibolga hydropower plant
Issue Date: 2004
Publisher: Universitas Medan Area
Series/Report no.: NPM;028130060
Abstract: Listrik saat sekarang sudah menjadi kebutuhan pnmer bagi masyarakat dan perusahaan serta pabrik-pabrik dimana kebutuhan akan pasokan listrik juga semakin meningkat, maka dari pihak PT. PLN (Persero) juga meningkatkan kualitas dan kuantitas pembangkit listriknya baik itu tenaga diesel, gas, uap, dan air. Seperti halnya dengan PL TA (Pembangkit Listrik Tenaga Air) Sipan Sihaporas yang berada di kota Sibolga tepatnya didesa Sihaporas Kabupaten Tapanuli Utara Propinsi Sumatera Utara yang baru saja dibangun dan diresmikan oleh Menteri Sumber Daya dan Energi baru-baru ini (Power Station No. I dengan daya 17 MW head 67,3 m), karena letak keadaan alam Sibolga yang terdiri dari pegunungan sehingga sangat memungkinkan untuk dibangun PLTA, direncanakan pembangunan terdiri dari 2 (dua) buah rumah turbin (Power Station), ini meliputi pembangunan Dam penampungan air yang juga akan dijadikan obyek wisata, pembangunan Head Race sepanjang 115 m, kemudian pembangunan Turbin Air Type f rancis dengan daya output 33 MW (PS No. 2) dan 17 MW (PS No. I) dengan jumlah total output 50 MW, dan disertai pembangunan Tail Race yang dilengkapi dengan pengaturan secara komputerisasi sehingga penggunaan lebih efesien dan efektif, spesifikasi pembangunan terlampir. Karena PLT A ini masih dalam pembangunan sehingga sangat memungkinkan bagi penulis untuk meriset langsung dan mengetahui bagian-bagian dalam turbin. Tujuan dari pembangunan PL TA ini adalah untuk meningkatkan pasokan listrik di daerah Sumatera Utara dan membantu PLTD, PLTG, PLTU dan PLTMH yang ada agar tidak terjadi kekurangan pasokan listrik untuk daerah Sumatera Utara dan Nias. Turbin Francis ini dibuat oleh Thosiba co, Jepang, yang bekerja sama denb>an kontraktor local (TEPSCO) dan bergaransi selama 2 tahun yang hamper menelan biaya Rp. 175 Miliar. Nowadays electricity has become a primary need for society and society companies and factories where the need for electricity supplies is also increasing increases, then from the PT. PLN (Persero) is also improving quality and quantity The power plants include diesel, gas, steam and water. Such is the case with PL TA (Hydroelectric Power Plant) Sipan Sihaporas which is in the city of Sibolga, precisely in the village of Sihaporas, North Tapanuli Regency, Province North Sumatra which has just been built and inaugurated by the Minister of Resources and Recent energy (Power Station No. I with a power of 17 MW head 67.3 m), due to the location Sibolga's natural condition consists of mountains so it is very possible to hydroelectric power plant is being built, the construction is planned to consist of 2 (two) turbine houses (Power Station), this includes the construction of a water storage dam which will also be used as an object tourism, construction of a 115 m long Head Race, then construction of a Water Turbine Type f rancis with output power of 33 MW (PS No. 2) and 17 MW (PS No. I) with the total output is 50 MW, and is accompanied by the construction of a Tail Race which is equipped with computerized settings so that use is more efficient and effective, specifications attached development. Because PLT A is still under construction, it is very possible for author to research directly and find out the internal parts of the turbine. The aim of the PL TA construction is to increase electricity supply in North Sumatra region and help existing PLTD, PLTG, PLTU and PLTMH to operate There is no shortage of electricity supply for the North Sumatra and Nias areas. This Francis turbine is made by Thosiba co, Japan, which collaborates with local contractor (TEPSCO) and guaranteed for 2 years which almost costs Rp. 175 Billion.
Description: 99 Halaman
URI: https://repositori.uma.ac.id/handle/123456789/22469
Appears in Collections:SP - Mechanical Engineering

Files in This Item:
File Description SizeFormat 
028130060 - Heru Roestamaji - Fulltext.pdfCover, Abstract, Chapter I, II, III, V, Bibliography3.43 MBAdobe PDFView/Open
028130060 - Heru Roestamaji - Chapter IV.pdf
  Restricted Access
Chapter IV2.61 MBAdobe PDFView/Open Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.