dc.description.abstractBiaya proyek terdiri dari atas beberapa komponen biaya, yaitu biaya material meliputi harga material dan biaya pemindahannya ke lokasi pekerjaan. Harga material tersebut dipengaruhi oleh jenis bahan dan fluktuasi harga pembelian. Biaya upah tenaga kerja, tergantung pada beberapa faktor, yaitu jenis tenaga kerja, wah.1u tenaga kerja, lokasi pekerjaan, persaingan tenaga kerja, kepadatan penduduk, tenaga kerja pinjaman dan pendatang serta fluktuasi upah tenaga kerja. Metoda-metoda analisa anggaran biaya yng dibahas dalam laporan ini adalah metoda B.O.W., cara Ir. A Soedrajat S., metoda yang ditetapkan pada proyek-proyek Dir k.1orat Jenderal Cipta Karya. Pada dasamya, metoda yang diterapkan oleh Direktorat Jenderal Cipta Karya adalah metoda B.O.W. yang telah dimodifikasi, sehingga secara umum terdapat 2 kelompokjenis metoda, yakni : metoda B.O.W. dan metoda Ir. A Soedrajat S. berdasarkan analisa yang dilakukan terhadap pekerjaan tanah, pondasi dan balok, dapat diketahui perbedaan-perbedaan yang terdapat diantara metoda-metoda tersebut, yaitu cara perhitungan harga total setiap jenis pekerjaan dan koefiseian yang digunakan dalam perhitungan tersebut. Sistem informasi manajemen sangat diperlukan guna untuk menyajikan informasi juga untuk mendukung fungsi operasi manajemen dalam analisa biaya proyek secara umum dibagi menjadi 3 bagian, yaitu informasi dalam organisasi, informasi yang menghubungkan organisasi dengan sistem informasi biaya proyek dan subsistem analisa anggaran biaya proyek dalam suatu sistem informasi biaya proyek. Expense project compose of some components expense, that is material expense cover the materialprice and evacuation expense of to work location. the material price influenced by materials type and purchasing price fluctuation. labour wage expense, depend on some factors, that is labour type, density, loan labour and of pendatang and also labour fee fluctuation. Method analyse discussed in budget in this report is method of B.O.W. , way oflr. A. Soedrajat S., method specified at Direktorat Jenderal Cipta Karya are method of B.O.W. which have modified, so that in general there are 2 method ! type group, namely : method of B.O.W. and method of Ir. A. Soedrajat S. pursuant to analysis work of land;ground, log and foundation, can know difference which there are among method, that is way oflis calculation total price each;every work type and coefficient which used in calculation. Management information system very need to refpresent information also to support management operations function. In analysis of expense of project is in general divided to become 3 shares, that is information in organization, connective information organization with information system oflis expense of and project of subsistem analyse budget of information system of expense of project.en_US
dc.language.isoiden_US
dc.publisherUniversitas Medan Areaen_US
dc.relation.ispartofseriesNPM;978110019-
dc.subjectanggaran biaya cara lama dengan cara modernen_US
dc.subjectsystem informasi biaya proyeken_US
dc.subjectold way cost budgets with modern waysen_US
dc.subjectproject cost information systemsen_US
dc.titlePerbandingan Anggaran Biaya Cara Lama dengan Cara Modern dan Pengaruhnya terhadap System Informasi Biaya Proyek (Study Literatur)en_US
dc.title.alternativeComparison of Old Way Cost Budgets with Modern Ways and Their Effects on Project Cost Information Systems (Study Literature)en_US
dc.typeSkripsi Sarjanaen_US
Appears in Collections:SP - Civil Engineering

Files in This Item:
File Description SizeFormat 
978110019 - Rico Pandapotan Girsang - Fulltext.pdfCover, Abstract, Chapter I, II, III, V, Bibliography4.74 MBAdobe PDFView/Open
978110019 - Rico Pandapotan Girsang - Chapter IV.pdf
  Restricted Access
Chapter IV907.08 kBAdobe PDFView/Open Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.