Title: | Evaluasi Waktu Pemakaian Alat Berat pada Pekerjaan Hot Roled Sheet proyek Pelebaran Jalan Sarudik Sibuluan Kabupaten Tapanuli Tengah |
Other Titles: | Evaluation of Heavy Equipment Use Time for Hot Rolled Sheet Work on the Sarudik Sibuluan Road Widening Project, Central Tapanuli Regency |
Authors: | Panggabean, Lisanti |
metadata.dc.contributor.advisor: | Ardan, Melloukey |
Keywords: | Waktu Pemakaian Alat Berat;Pekerjaan Hot Roled Sheet;Heavy Equipment Usage Time |
Issue Date: | 2004 |
Publisher: | Universitas Medan Area |
Series/Report no.: | NPM;978110025 |
Abstract: | Dalam hal penyediaan peralatan untuk menyelesaikan proyek, kontraktor harus mernikirkan dan memperrimbangkan cara yang harus ditempuh, apakah perlu membeli sesuatu jenis peralatan, ataukah cukup dengan menyewanya saja. Sebab dalam kondisi tertentu menyewa bisa lebih menguntungkan dari pada membeli, tetapi dalam kondisi lain., membeli lebih menguntungkan dari pada rnenyewa. In terms of providing equipment to complete the project, the contractor You have to think about and consider what method you should take do you need to buy some type of equipment, or can you just rent it? Because under certain conditions renting can be more profitable than renting buying, but under other conditions., buying is more profitable than rent. |
Description: | 61 Halaman |
URI: | https://repositori.uma.ac.id/handle/123456789/24747 |
Appears in Collections: | SP - Civil Engineering |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
978110025 - Lisanti Panggabean - Chapter IV.pdf Restricted Access | Chapter IV | 916.71 kB | Adobe PDF | View/Open Request a copy |
978110025 - Lisanti Panggabean - Fulltext.pdf | Cover, Abstract, Chapter I, II, III, V, Bibliography | 3.72 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.