Please use this identifier to cite or link to this item: https://repositori.uma.ac.id/handle/123456789/24765
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorSyarif, Yance-
dc.contributor.authorArdiansyah-
dc.date.accessioned2024-07-24T05:08:02Z-
dc.date.available2024-07-24T05:08:02Z-
dc.date.issued2005-01-
dc.identifier.urihttps://repositori.uma.ac.id/handle/123456789/24765-
dc.description55 Halamanen_US
dc.description.abstractEnergi Listrik merupakan salah satu kebutuhan yang harus dipenuhi dalam kehidupan sehari hari, hal ini seiring dengan kemajuan yang menuntut kontinuitas penyediaan energi listrik Electrical energy is one of the needs that must be met in daily life, this is in line with progress that demands continuity in the supply of electrical energyen_US
dc.language.isoiden_US
dc.publisherUniversitas Medan Areaen_US
dc.relation.ispartofseriesNPM;988120002-
dc.subjectMengatasi Beban Puncak Pembangkit Listrik Tenaga Airen_US
dc.subjectOvercoming Peak Loads of Hydroelectric Power Plantsen_US
dc.subjectpompa airen_US
dc.titleStudi Mengatasi Beban Puncak Pembangkit Listrik Tenaga Air dengan menggunakan Pompa Airen_US
dc.title.alternativeStudy on Overcoming Peak Loads of Hydroelectric Power Plants using Water Pumpsen_US
dc.typeThesisen_US
Appears in Collections:SP - Electrical Engineering

Files in This Item:
File Description SizeFormat 
098120002 - Ardiansyah - Chapter IV.pdf
  Restricted Access
Chapter IV2.88 MBAdobe PDFView/Open Request a copy
098120002 - Ardiansyah - Fulltext.pdfCover, Abstract, Chapter I, II, III, V, Bibliography9.25 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.