DC Field | Value | Language |
---|---|---|
dc.contributor.advisor | Lubis, Kamaluddin | - |
dc.contributor.author | Hutagaol, Sixnor | - |
dc.date.accessioned | 2024-11-22T07:09:17Z | - |
dc.date.available | 2024-11-22T07:09:17Z | - |
dc.date.issued | 2024-08-28 | - |
dc.identifier.uri | https://repositori.uma.ac.id/handle/123456789/25873 | - |
dc.description | 63 Halaman | en_US |
dc.description.abstract | Dalam pelaksanaan proyek pembangunan pekerjaan tanah dapat dilakukan langsung dengan tenaga manusia (manual) atau menggunakan bantuan tenaga mesin (alat-alat berat). Pemilihan metode konstruksi atau kerja yang akan dipilih, tentunya tidak lepas dari pertimbangan-pertimbangan teknis dan ekonomis. Pemilihan alat berat yang akan digunakan merupakan salah satu upaya untuk mencapai keberhasilan suatu proyek. Agar suatu pekerjaan berjalan lancar, alat berat yang dipilih haruslah tepat agar terciptanya efesiensi waktu dan biaya. Pada karya ilmiah ini bertujuan untuk mencari kombinasi alat berat yang optimal dan mencari berapa lama waktu yang dapat dihemat dengan menggunakan kombinasi alat berat. Penelitian ini menggunakan metode produktivitas alat berat, penentu jenis dan jumlah alat sesuai dengan medan lokasi. metode perhitungan yang dilakukan dengan cara trial and error. Dari trial perhitungan produksi alat berat dengan mengambil tiga alternatif. Nilai produktivitas yang terbaik didapatkan pada perhitungan alternatif 3 dengan hasil produktivitas excavator 155,76 m3/jam, bulldozer 106,8 m3/jam, dan motor grader 278,37 m3/jam. Untuk mendapatkan kombinasi alat berat dari segi waktu dan biaya yaitu dengan melakukan berbagai alternatif perhitungan kombinasi jumlah alat berat yang sesuai dengan medan. Dengan perhitungan tersebut maka didapatlah kombinasi alat yang optimal pada perhitungan alternatif 3. Kombinasi alat berat yang direkomendasikan untuk pekerjaan galian timbunan dan pengangkutan pada proyek Pembangunan Stadion Teladan Medan yang paling efisien dari segi waktu dan biaya adalah alternatif 3 yang terdiri dari unit excavator 4 unit, Bulldozer 3 unit, dan motor grader 1 unit. In implementing construction projects, earthworks can be carried out directly with human power (manual) or using the help of machines (heavy equipment). The choice of construction or work method to be chosen, of course cannot be separated from technical and economic considerations. Selecting the heavy equipment to be used is one of the efforts to achieve the success of a project. In order for a job to run smoothly, the heavy equipment chosen must be appropriate to create time and cost efficiencies. This scientific work aims to find the optimal combination of heavy equipment and find out how much time can be saved by using a combination of heavy equipment. This research uses the heavy equipment productivity method, determining the type and number of equipment according to the location terrain. The calculation method is carried out by trial and error. From the trial calculation of heavy equipment production by taking three alternatives. The best productivity value was obtained in alternative 3 calculations with productivity results for excavators of 155.76 m3/hour, bulldozers of 106.8 m3/hour, and motor graders of 278.37 m3/hour. To get a combination of heavy equipment in terms of time and cost, namely by carrying out various alternative calculations of combinations of the number of heavy equipment that are appropriate to the terrain. With these calculations, the optimal combination of tools is obtained in alternative 3 calculations. The combination of heavy equipment recommended for embankment excavation and transportation work on the Teladan Medan Stadium Construction project which is most efficient in terms of time and cost is alternative 3 which consists of 4 excavator units, 3 units of bulldozer, and 1 motor grader unit. | en_US |
dc.language.iso | id | en_US |
dc.publisher | UNIVERSITAS MEDAN AREA | en_US |
dc.relation.ispartofseries | NPM;208110035 | - |
dc.subject | produktivitas alat berat | en_US |
dc.subject | komposisi alat berat | en_US |
dc.subject | galian | en_US |
dc.subject | timbunan | en_US |
dc.subject | heavy equipment productivity | en_US |
dc.subject | heavy equipment composition | en_US |
dc.subject | excavation | en_US |
dc.subject | backfilling | en_US |
dc.title | Analisis Pemilihan Alat Berat dalam Pekerjaan Galian, Penimbunan dan Pemindahan Tanah pada Proyek Pembangunan Stadion Teladan Medan | en_US |
dc.title.alternative | Analysis of Heavy Equipment Selection in Excavation, Piling and Earth Moving Work on the Medan Teladan Stadium Construction Project | en_US |
dc.type | Skripsi Sarjana | en_US |
Appears in Collections: | SP - Civil Engineering |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
208110035 - Sixnor Hutagaol - Fulltext.pdf | Cover, Abstract, Chapter I, II, III, V, Bibliography | 1.57 MB | Adobe PDF | View/Open |
208110035 - Sixnor Hutagaol - Chapter IV.pdf Restricted Access | Chapter IV | 470.14 kB | Adobe PDF | View/Open Request a copy |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.