Skip navigation
Home
Browse
Communities
& Collections
Browse Items by:
Issue Date
Author
Title
Subject
???browse.menu.advisor???
Help
Sign on to:
My DSpace
Receive email
updates
Edit Profile
Digital Repository Universitas Medan Area
Search
Search:
All of DSpace
Student Papers (SP)
Engineering
SP - Industrial Engineering
for
Current filters:
Title
Author
Subject
Date Issued
Has File(s)
???jsp.search.filter.original_bundle_filenames???
???jsp.search.filter.original_bundle_descriptions???
Equals
Contains
ID
Not Equals
Not Contains
Not ID
Start a new search
Add filters:
Use filters to refine the search results.
Title
Author
Subject
Date Issued
Has File(s)
???jsp.search.filter.original_bundle_filenames???
???jsp.search.filter.original_bundle_descriptions???
Equals
Contains
ID
Not Equals
Not Contains
Not ID
Results 511-520 of 569 (Search time: 0.006 seconds).
previous
1
...
49
50
51
52
53
54
55
...
57
next
Item hits:
Issue Date
Title
Author(s)
???itemlist.dc.contributor.advisor???
2005
Penentuan Ramalan Volume Penjualan Aluminium Ekstrudsi Di PT. Cakra Compact Aluminium Industries Medan
Fuadi, Sirojul
Singh, Rasphal; Munthe, Sirmas
Jun-2003
Pengukuran produktivitas tenaga kerja Depot LPG Tandem Pertamina Unit pemasaran - I Medan dalam rangka menghadapi era perdagangan bebas dan globalisasi ekonomi dunia
Kuwatno
Haniza; Mustafa, Kamil
2005
Analisa Kegiatan Promosi dan Pendistribusian Kendaraan Roda Empat Pada PT. Mega Central Auto Niaga Medan
Suhendra, Kiki
Mustafa, Kamil; Abdurrozzaq
2005
Analisis Jaringan Kerja Pembangunan Pabrik Kelapa Sawit Kapasitas 30 -60 Ton TBS/Jam Dengan Metode Pert Di PT. Erakarya Jatayumas Medan
Syahputra, Deni
Surbakti, Adil; Singh, Raspal
2003
Menentukan Jumlah Tenaga Kerja Dengan Menggunakan Metode Waktu Standart Pada Proses Pengisian Tabung LPG Di Pertamina Depot Elpiji Tandem
Suadi
Singh, Rasphal; Mustafa, Kamil
2002
Optimasi Biaya Perawatan Minimum Berdasarkan Tingkat Kerusakan Pada Mesin Sizing dan Mesin Forming di PT. Intanmas Indologam
Achmad, Nurjannah
Mustafa, Kamil; Banjarnahor, Maruli
2005
Studi Kelayakan Pengembangan Pabrik Minyak Kelapa Sawit Dari Kapasitas 45 Ton TBS/Jam Menjadi Kapasitas 90 Ton TBS/Jam
Suprapto
-
2005
Segmentasi Pasar Sebagai Sasaran Dalam Usaha Meningkatkan Penjualan Pada PT. Voltama Vista Megah Electric Industry Medan
Akhmad, Hanafi
Mustafa, Kamil; Singh, Raspal
2005
Penentuan Umur Ekonomis Mesin Evaporator Di PT. Perkebunan Nusantara II Pabrik Gula Kuala Madu
Simalango, Marulak
Mustafa, Kamil; Banjarnahor, Maruli
May-2002
Perbaikan Kualitas dengan Menggunakan Plan-Do-Check-Ac (PDCA) untuk Mencegah Terjadinya Kerusakan Produk pada PT. Intan Mas Indologam
Sinurat, Hersakso
-
Discover
Author
2
Gusti, Rizki Nanda
2
Harahap, Rahmat Subhansyah
2
Irwansyah
2
Kurniawan, Andi
2
Muis, Abdul
2
Nainggolan, Taruli
2
Prasetya, Teguh
2
Saragih, Faisal Algaffar
2
Situmorang, Ronald
2
Suprapto
.
next >
Subject
16
produktivitas
11
packaging
11
quality control
10
Produksi
9
kansei engineering
9
kemasan
9
kualitas pelayanan
8
persediaan
7
antropometri
7
kepuasan pelanggan
.
next >
Date issued
275
2020 - 2024
143
2010 - 2019
150
2000 - 2009
1
1997 - 1999