Please use this identifier to cite or link to this item: https://repositori.uma.ac.id/handle/123456789/27412
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorSyahrial, Hery-
dc.contributor.authorBr Ginting, Irda Eliana-
dc.date.accessioned2025-06-03T06:20:11Z-
dc.date.available2025-06-03T06:20:11Z-
dc.date.issued2025-03-
dc.identifier.urihttps://repositori.uma.ac.id/handle/123456789/27412-
dc.description99 Halamanen_US
dc.description.abstractPenelitian ini bertujuan untuk mengetahui pengaruh penjadwalan produksi, pengendalian persediaan bahan baku dan komitmen organisasi terhadap kinerja organisasi pada PT. Sumatera Timber Indo Industry secara parsial. Penelitian menggunakan sampel sebanyak 144 karyawan yang dipilih menggunakan dengan tehnik convinience sampling. Data di sebarkan mengunakan kuesioner dengan skala likert melalui google form. Penelitian ini menggunakan metode analisis data berupa statistik deskriptif dan inferensial. Statistik deskriptif digunakan untuk mengolah dan menyajikan data demografi responden dalam bentuk persentase. Untuk statik inferensial dianalisis menggunakan SEM-PLS dengan aplikasi Smart PLS versi 3.0. Hasil analisis menunjukkan adanya pengaruh positif dan signifikan antara penjadwalan produksi , pengendalian persediaan dan komitmen organisasi terhadap kinerja organisasi secara parsial. Studi ini memberikan kontribusi keterbaharuan pada model penelitian yang sejauh ini belum peneliti temukan pada penelitian sebelumnya pada pengaruh penjadwalan produksi, pengendalian persediaan bahan baku dan komitmen organisasi terhadap kinerja organisasi dalam satu kerangka penelitian. Secara praktis menunjukan pentingnya variabel eksogen (penjadwalan produksi, pengendalian persediaan bahan baku dan komitmen organisasi) dalam meningkatkan variabel endogen (kinerja organisasi ). This study aims to determine the effect of production scheduling, raw material inventory control and organizational commitment on organizational performance at PT. Sumatera Timber Indo Industry partially. The study used a sample of 144 employees selected using convenience sampling techniques. Data were distributed using a questionnaire with a Likert scale via Google Form. This study uses data analysis methods in the form of descriptive and inferential statistics. Descriptive statistics are used to process and present respondent demographic data in the form of percentages. For inferential statistics, it was analyzed using SEM-PLS with the Smart PLS version 3.0 application. The results of the analysis showed a positive and significant influence between production scheduling, inventory control and organizational commitment on organizational performance partially. This study contributes to the novelty of the research model that researchers have not found in previous studies on the effect of production scheduling, raw material inventory control and organizational commitment on organizational performance in one research framework. Practically shows the importance of exogenous variables (production scheduling, raw material inventory control and organizational commitment) in increasing endogenous variables (organizational performance).en_US
dc.language.isoiden_US
dc.publisherUniversitas Medan Areaen_US
dc.relation.ispartofseriesNPM;218320283-
dc.subjectProduction Schedulingen_US
dc.subjectInventory Controlen_US
dc.subjectOrganizational Commitmenten_US
dc.subjectOrganizational Performanceen_US
dc.subjectManufacturingen_US
dc.subjectSEM-PLSen_US
dc.subjectPengendalian Persediaan Bahan Bakuen_US
dc.subjectPengendalian Persediaan Bahan Bakuen_US
dc.subjectPenjadwalan Produksien_US
dc.titlePengaruh Penjadwalan Produksi, Pengendalian Persediaan Bahan Baku Dan Komitmen Organisasi Terhadap Kinerja Organisasi Pada Pt. Sumatera Timber Indo Industryen_US
dc.title.alternativeThe Influence of Production Scheduling, Raw Material Inventory Control and Organizational Commitment on Organizational Performance at PT. Sumatera Timber Indo Industryen_US
dc.typeThesisen_US
Appears in Collections:SP - Management

Files in This Item:
File Description SizeFormat 
218320283 - Irda Eliana Br Ginting - Chapter IV.pdf
  Restricted Access
Chapter IV599.81 kBAdobe PDFView/Open Request a copy
218320283 - Irda Eliana Br Ginting - Fulltext.pdfCover, Abstract, Chapter I, II, III, V, Bibliography1.77 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.