Please use this identifier to cite or link to this item:
https://repositori.uma.ac.id/handle/123456789/30728Full metadata record
| DC Field | Value | Language |
|---|---|---|
| dc.contributor.advisor | Rangkuti, Nuril Mahda | - |
| dc.contributor.author | Febrianti, Sri Dwi | - |
| dc.date.accessioned | 2026-08-04T04:11:50Z | - |
| dc.date.available | 2026-08-04T04:11:50Z | - |
| dc.date.issued | 2026-04-07 | - |
| dc.identifier.uri | https://repositori.uma.ac.id/handle/123456789/30728 | - |
| dc.description | 88 Halaman | en_US |
| dc.description.abstract | Angkutan kota berperan penting dalam mendukung mobilitas perkotaan terutama di Kota Medan. Penelitian ini bertujuan untuk mengevaluasi kebutuhan jumlah armada angkutan kota KPUM M97 pada rute Perbaungan–Medan Denai berdasarkan metode Load Factor. Permasalahan ini di fokuskan pada ketidakseimbangan antara jumlah armada yang beroperasi dan permintaan penumpang, yang menimbulkan waktu tunggu lama, serta penurunan kualitas pelayanan. Metode penelitian ini adalah kuantitatif dengan pendekatan observasi menggunakan optimasi load factor, data primer diperoleh melalui pengamatan jumlah penumpang naik turun, kapasitas kendaraan. Analisis dilakukan dengan menghitung nilai load factor aktual dan membandingkan dengan standar pelayanan angkutan umum. Dari hasil perhitungan menunjukkan bahwa nilai load factor angkutan kota KPUM M97 berada dibawah standar ideal. Sehingga diperlukan pengurangan jumlah armada sebanyak 24 unit. Public transportation plays a vital role in supporting urban mobility, particularly in the city of Medan. This study aims to evaluate the required fleet size for the KPUM M97 public transportation route between Perbaungan and Medan Denai using the load factor method. The focus of this study is on the imbalance between the number of vehicles in operation and passenger demand, which results in long wait times and a decline in service quality. This study employs a quantitative research method with an observational approach using load factor optimization; primary data was obtained through observations of passenger boarding and alighting numbers, as well as vehicle capacity. The analysis was conducted by calculating the actual load factor values and comparing them with public transportation service standards. The results indicate that the load factor of the KPUM M97 urban transport fleet falls below the ideal standard. Consequently, a reduction of 24 units in the fleet size is required. | en_US |
| dc.language.iso | id | en_US |
| dc.publisher | Universitas Medan Area | en_US |
| dc.relation.ispartofseries | NPM;228110022 | - |
| dc.subject | Angkutan Kota | en_US |
| dc.subject | Optimalisasi Load Factor | en_US |
| dc.subject | Public Transportation | en_US |
| dc.subject | Optimization Load Factor | en_US |
| dc.title | Evaluasi Kebutuhan Jumlah Armada Angkutan Kota Medan Rute Perbaungan – Medan Denai Dengan Menggunakan Metode Load Factor | en_US |
| dc.title.alternative | Evaluation of the Required Number of Medan City Public Transportation Vehicles on the Perbaungan–Medan Denai Route Using the Load Factor Method | en_US |
| dc.type | Thesis | en_US |
| Appears in Collections: | SP - Civil Engineering | |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| 228110022 - Sri Dwi Febrianti - Fulltext.pdf | Cover, Abstract, Chapter I, II, III, V, Bibliography | 853.65 kB | Adobe PDF | View/Open |
| 228110022 - Sri Dwi Febrianti - Chapter IV.pdf Restricted Access | Chapter IV | 1.64 MB | Adobe PDF | View/Open Request a copy |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.