Title: Mempercepat Jadwal Penyelesaian Proyek Konstruksi
Other Titles: Accelerate Construction Project Completion Schedules
Authors: Husin, Muhammad
metadata.dc.contributor.advisor: Irwan
Arda, Melloukey
Keywords: Jadwal Penyelesaian Proyek Konstruksi;Construction Project Completion Schedule
Issue Date: 2006
Publisher: Universitas Medan Area
Series/Report no.: NPM;988110003
Abstract: Pekerjaan kontruksi memerlukan suatu manajemen yang baik dalam perencanaan dan pelaksanaan agar penyimpangan-penyimpangan dari rencana semula dapat dihindari, sehingga tercapai suatu hasil yang diharapkan. Construction work requires good management in planning and implementation to prevent deviations from the original plan can be avoided, so that a good result is achieved expected.
Description: 86 Halaman
URI: https://repositori.uma.ac.id/handle/123456789/22376
Appears in Collections:SP - Civil Engineering

Files in This Item:
File Description SizeFormat 
988110003 - Muhammad Husin - Fulltext.pdfCover, Abstract, Chapter I, II, III, V, Bibliography4.93 MBAdobe PDFView/Open
988110003 - Muhammad Husin - Chapter IV.pdf
  Restricted Access
Chapter IV441.43 kBAdobe PDFView/Open Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.