Please use this identifier to cite or link to this item:
https://repositori.uma.ac.id/handle/123456789/8112
Title: | Analisa Pengendalian Waktu dan Biaya Terhadap Efektifitas Kerja dengan Menggunakan Metode Motion and Time Study pada Bangunan Konstruksi (Studi Kasus) |
Authors: | Ramadhona, Andry Maxura |
metadata.dc.contributor.advisor: | Ardan, Melloukey Lubis, Kamaluddin |
Keywords: | Motion Performance;Time Study |
Issue Date: | 11-Dec-2017 |
Publisher: | Universitas Medan Area |
Abstract: | Dengan semakin berkembangnya industrI konstruksi di Indonesia maka semakin dirasakan perlunya estimasi biaya pelaksanaan konstruksi dan memperkirakan standar produktivitas tenaga kerja yang akurat. Karena pada estimasi biaya pelaksanaan konstruksi saat ini sering tidak tepatnya estimator dalam memperkirakan produktivitas tenaga kerja karena estimator masih mempergunakan standar yang dikeluarkan dianggan tidak sesuai dengan perkembangan saat ini . Berdasarkan pengalaman para kontraktor dan para estimator biaya konstruksi memberikan angka koreksi terhadap standar-standar tersebut sangat berbeda dengan keadaan sekarang Untuk dapat memperkecil kesalahan dalam mengestimasi biaya pelaksanaan konstruksi adalah salah satu cara yang dapat dilakukan dengan mengadakan penelitian dan penyusunan standar produktivitas tenaga kerja dengan “Metoda Motion And Time Study yaitu metode atau cara yang dilakukan dalam mengukur kemajuan kinerja kerja , sehingga dengan demikian kerugian karena kesalahan estimasi dapat diperkecil. Berdasarkan hasil penelitian yang dilakukan untuk upah pekerja pengecoran balok beton didapat Rp.65.122/ m3 . sedangkan berdasarkan biaya pelaksanaan dilapangan atau proyek konstruksi untuk pengecoran balok beton didapat Rp.70.099/ m3 dengan kesimpulan upah kerja sudah tidak memenuhi lagi dam perlu dilakukan evalusi selanjutmya. |
Description: | With the development of the construction industry in Indonesia, it is increasingly felt the need to estimate the cost of construction implementation and estimate the accurate labor productivity standard. Because the current construction cost estimates are often not accurate estimators in estimating labor productivity because estimators still use the standards issued in the subscription not in accordance with current developments. Based on the experience of contractors and construction cost estimators, the correction of those standards is very different from the current situation. To be able to minimize the mistake in estimating the cost of construction implementation is one way that can be done by conducting research and preparation of labor productivity standards with "Method Motion And Time Study is a method or way that is done in measuring the progress of work performance, so that the losses due to error estimation can be minimized. Based on the results of research conducted for workers wage foundry beam concrete obtained Rp.65.122 / m3. While based on the cost of the implementation of the field or construction project for concrete beam founding Rp.70.099 / m3 with the conclusion of wage work is not meet again and need to be evaluated |
URI: | https://repositori.uma.ac.id/handle/123456789/8112 |
Appears in Collections: | SP - Civil Engineering |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
108110079.pdf | Fulltext | 16.06 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.