Please use this identifier to cite or link to this item:
https://repositori.uma.ac.id/handle/123456789/11305
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.advisor | Munte, Sirmas | - |
dc.contributor.advisor | Hasibuan, Chalis Fajri | - |
dc.contributor.author | Putri, Ummi Habibi | - |
dc.date.accessioned | 2019-12-06T02:36:43Z | - |
dc.date.available | 2019-12-06T02:36:43Z | - |
dc.date.issued | 2019-10-25 | - |
dc.identifier.uri | http://repository.uma.ac.id/handle/123456789/11305 | - |
dc.description | PT. Socfin Indonesia Kebun Matapao merupakan perusahaan yang bergerak dibidang pabrik kelapa sawit. PT. Socfin Indonesia Kebun Matapao merupakan perusahaan manufaktur yang hasil produk utama berupa minyak mentah, dan biji kernel. Luas area PT. Socfin Indonesia Kebun Matapao ini adalah ± 829 Ha. Permasalahan yang dihadapi perusahaan adalah jarak yang diperoleh antara kantor pabrik dan kantor pengurus sejauh ± 20 meter, sehingga hubungan surat menyurat terlalu jauh untuk menyampaikan informasi, jarak antara lantai produksi ke laboratorium sejauh ± 81 meter, sehingga mempengaruhi waktu pekerjaan dan mengurangi produktifitas. Hal inilah yang diperlukan adanya perbaikan fasilitas produksi yang digunakan. Penelitian ini bertujuan untuk mempersingkat waktu karyawan dan memberikan usulan perbaikan tata letak (Re-layout) di pabrik PT. Socfin Indonesia Kebun Matapao, agar meningkatkan produktifitas kerja beserta tata letak yang lebih teratur sehingga lebih efektif dan efisien dalam segi tenaga kerja yang dipakai. Dan pengangolahan data tersebut menggunakan metode Sistematic Layout Planning dan Blocplan. | en_US |
dc.description.abstract | PT. Socfin Indonesia Kebun Matapao is a company engaged in the oil palm factory field. It is a manufacturing company in which the main products are crude oil and palm kernel. The area width of PT. Socfin Indonesia Kebun Matapao is ± 829 Ha. The problem faced by the company is the distance between the factory office and management office of ± 20 meters away, so the correspondence relationship is too far to deliver the information. Also, the distance between the production floor and laboratory of ± 81 meters, so it influences the working time and reducing productivity. Then it is needed to repair the production facilities used. This study aimed to shorten the employees’ time and to give a layout repairs proposal (Re-layout) at the factory of PT. Socfin Indonesia Kebun Matapao, to increase the working productivities and more organized layout so it will be more effective and efficient from the working power side used. Furthermore, the data processing used the Systematic Layout Planning and Blocplan methods. | en_US |
dc.language.iso | id | en_US |
dc.publisher | Universitas Medan Area | en_US |
dc.relation.ispartofseries | NPM;158150048 | - |
dc.subject | Re-Layout | en_US |
dc.subject | Systematic Layout Planning | en_US |
dc.subject | Blocplan | en_US |
dc.title | Perbaiki Tata Letak Fasilitas Pada Perkantoran Kelapa Sawit PT.Socfin Indonesia Kebun Matapao Sumatra Utara | en_US |
dc.title.alternative | "The Repairs Of Facilities Layout at Oil Palm Offices Of PT. Socfin Indonesia Kebun Matapao" | en_US |
dc.type | Thesis | en_US |
Appears in Collections: | SP - Industrial Engineering |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
158150048 - Ummi Habibi Putri - Fulltext.pdf | Cover, Abstract, Chapter I,II,III, Bibliography | 2.4 MB | Adobe PDF | View/Open |
158150048 - Ummi Habibi Putri - Chapter IV.pdf Restricted Access | Chapter IV | 1.18 MB | Adobe PDF | View/Open Request a copy |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.