dc.description.abstractBanjir yang terjadi pada Kawasan Industri Medan khususnya pada PT Multi Guna menunjukkan bahwa debit hujan rencana lebih tinggi dibandingkan debit saluran yang menyebabkan drainase tidak dapat menampung sehingga air meluap dan mengakibatkan banjir, adapun faktor yang menyebabkan tingginya debit hujan rencana adalah intensitas curah hujan.Untuk menghitung debit hujan rencana digunakan metode rasional yang menggunakan 3 faktor utama yaitu Intensitas curah hujan maksimum, Luas wilayah, dan koefisien aliran(Run-Off). Intensitas curah hujan maksimum dari data curah hujan diolah dengan menggunakan Distribusi Log Person III, yang bertujuan untuk memperoleh harga debit hujan rencana dengan periode ulang (Q10). Hasil penelitian dan perhitungan didapatkan bahwa Debit saluran(Qs) 0,113 π‘š3⁄𝑑𝑒𝑑(sekunder 1) daerah sekitar PT Multi Guna jauh lebih kecil dibandingkan Debit hujan rencana(Qt) 6,559π‘š3⁄𝑑𝑒𝑑 (sekunder 1).Dengan demikian dapat ditarik kesimpulan bahwa sistem drainase yang sudah ada tidak dapat menampung debit hujan rencana, yang mengakibatkan air meluap. Untuk mengatasi masalah tersebut harus melakukan perbaikan saluran, memperbesar saluran atau dimensi yang sudah ada. Floods that occurred in the Medan Industrial Estate, especially at PT Multi Guna, indicate that the planned rain discharge is higher than the channel discharge which causes drainage to not accommodate so that the water overflows and causes flooding. rain discharge plan uses a rational method that uses 3 main factors, namely the maximum rainfall intensity, the area, and the flow coefficient (Run- Off). The maximum rainfall intensity from the rainfall data is processed using the Distribution Person Log III, which aims to obtain the price of the planned rainfall discharge with a return period (Q10). The results of the study and calculations found that the channe ldischarge (Qs) 0.113 m ^ 3⁄det (secondary 1) the area around PT Multi Guna is much smaller than the plan rain discharge (Qt) 6,559 m ^ 3⁄det (secondary 1). Thus it can be concluded that the existing drainage system cannot accommodate the planned rain discharge, which causes water to overflow. To solve this problem, you must do channel improvement, enlarge the existing channel or dimensions.en_US
dc.language.isoiden_US
dc.publisherUniversitas Medan Areaen_US
dc.relation.ispartofseriesNPM;148110115-
dc.subjectmetode rasionalen_US
dc.subjectdistribusi log person IIIen_US
dc.subjectdebit hujan rencanaen_US
dc.subjectdebit saluranen_US
dc.subjectdimensi drainaseen_US
dc.subjectrational methodsen_US
dc.subjectplan rain dischargeen_US
dc.subjectchannel dischargeen_US
dc.subjectdrainage dimensionsen_US
dc.titleEvaluasi Perhitungan Dimensi Drainase pada Kawasan Industri Modern II (KIM II) Medanen_US
dc.title.alternativeEvaluation of Drainage Dimension Calculation in Modern Industrial Estate II (KIM II) Medanen_US
dc.typeThesisen_US
Appears in Collections:SP - Civil Engineering

Files in This Item:
File Description SizeFormat 
148110115 - Feri Armando Hutagaol Fulltext.pdfCover, Abstract, Chapter I,II,III, Bibliography3.6 MBAdobe PDFView/Open
148110115 - Feri Armando Hutagaol Chapter IV.pdf
  Restricted Access
Chapter IV916.17 kBAdobe PDFView/Open Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.