Please use this identifier to cite or link to this item:
https://repositori.uma.ac.id/handle/123456789/16682
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.advisor | Haniza | - |
dc.contributor.advisor | Sutrisno | - |
dc.contributor.author | Lubis, Syahniar | - |
dc.date.accessioned | 2022-03-21T08:39:02Z | - |
dc.date.available | 2022-03-21T08:39:02Z | - |
dc.date.issued | 2017-11-27 | - |
dc.identifier.uri | http://repository.uma.ac.id/handle/123456789/16682 | - |
dc.description | 62 Halaman | en_US |
dc.description.abstract | PT. Perkebunan Nusantara II (Persero) Pagar Merbau-Pakam merupakan suatu perusahaan yang bergerak dibidang perkebunan dan industri. Kondisi yang terjadi pada perusahaan menunjukkan bahwa dalam penerapan anggaran biaya produksi perusahaan, masih terjadi deviasi yang merugikan antara anggaran dan realisasi biaya produksi. Penelitian ini bertujuan untuk mengetahui faktor-faktor penyebab terjadinya deviasi yang tinggi antara anggaran biaya produksi dengan realisasi biaya produksi, serta menganalisa pengaruh anggaran biaya produksi terhadap efektifitas dalam pengendalian biaya produksi dan penentuan harga pokok produksi yang lebih akurat dapat dilakukan dengan menggunakan metode activity based costing (ABC). Penelitian ini diharapkan dapat menjadi masukan bagi manajemen perusahaan mengenai peranan anggaran sebagai alat pengawasan kinerja operasional perusahaan serta peranan harga pokok produksi terhadap keuntungan perusahaan. Dari hasil pengamatan yang dilakukan bahwa perhitungan harga pokok produksi dengan menggunakan metode ABC lebih akurat dibandingkan dengan metode yang diterapkan perusahaan, dengan perolehan nilai yaitu sebesar Rp 5.440,94,-/Kg untuk menggunakan metode ABC dan sebesar Rp5.883,30,-/Kg untuk metode yang diterapkan perusahaan. Berdasarkan perhitungan tersebut diketahui bahwa selisih harga pokok produksi untuk produk crude palm oil (CPO) sebesar Rp397,36,-/Kg. PT. Perkebunan Nusantara II (Persero) Pagar Merbau-Pakam is a a company engaged in the plantation and industry. Conditions that happened to the company showed that in the implementation of the budget the company's production, there is still an adverse deviation between the budget and realization of production costs. This study aims to determine the factors the cause of the high deviation between the production cost budget and the realization of production costs, as well as analyzing the effect of the production cost budget on effectiveness in controlling production costs and pricing A more accurate production base can be done using the method activity based costing (ABC). This research is expected to be input for company management regarding the role of the budget as a monitoring tool the company's operational performance and the role of the cost of production on the company profits. From the observations made that the calculation of the cost of production using the ABC method is more accurate compared to the methods applied by the company, with the acquisition value is Rp. 5,440.94,-/Kg to use the ABC method and Rp. 5,883.30, -/Kg for the method applied by the company. Based on these calculations, it is known that the difference in the cost of production for crude palm oil (CPO) products of Rp.397.36,-/Kg. | en_US |
dc.language.iso | id | en_US |
dc.publisher | Universitas Medan Area | en_US |
dc.relation.ispartofseries | NPM;138150002 | - |
dc.subject | anggaran produksi | en_US |
dc.subject | biaya cpo | en_US |
dc.subject | harga pokok produksi | en_US |
dc.subject | activity based costing | en_US |
dc.subject | production cost budget | en_US |
dc.subject | cost cpo | en_US |
dc.subject | production main price | en_US |
dc.subject | abc | en_US |
dc.title | Analisis Anggaran Biaya Produksi Crude Palm Oil (CPO) dengan Metode ABC pada PT. Perkebunan Nusantara II PKS Pagar Merbau-Pakam | en_US |
dc.title.alternative | Budget Analysis of Crude Palm Oil (CPO) Production Cost with ABC Method at PT. Perkebunan Nusantara II PKS Fence Merbau-Pakam | en_US |
dc.type | Thesis | en_US |
Appears in Collections: | SP - Industrial Engineering |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
138150002 - Syahniar Lubis - Fulltext.pdf | Cover, Abstract, Chapter I, II, III, V, Bibliography | 1.3 MB | Adobe PDF | View/Open |
138150002 - Syahniar Lubis - Chapter IV.pdf Restricted Access | Chapter IV | 524.18 kB | Adobe PDF | View/Open Request a copy |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.