Please use this identifier to cite or link to this item:
https://repositori.uma.ac.id/handle/123456789/18763
Title: | Analisis Pengukuran Tingkat Produktivitas Produksi Dandang Aluminium Menggunakan Metode American Produktivity Center (APC) pada CV. Cipta Jaya |
Other Titles: | Analysis of Measuring Productivity Levels in Aluminum Boiler Production Using the American Productivity Center (APC) Method at CV. Cipta Jaya |
Authors: | Khairuddin |
Keywords: | produktivitas;the american produktivity center;tingkat produktivitas;productivity;the american productivity center;productivity levels |
Issue Date: | 21-Sep-2022 |
Publisher: | Universitas Medan Area |
Series/Report no.: | NPM;178150026 |
Abstract: | CV. Cipta Jaya merupakan perusahaan yang bergerak dibidang pembuatan dan perakitan dandang aluminium berlokasi di Jalan Besar Tembung N0. 11 Medan, yang didirikan oleh bapak Daiman pada tanggal 23 Mei 1998 dengan produksi utamanya yaitu dandang aluminium. Pada CV. Cipta Jaya kondisi karyawan pada saat bekerja sering kurang semangat dan tidak fokus saat proses produksi. Penggunaan mesin dan alat masih sangat sederhana sehingga proses produksi kurang optimal. Selain itu penjualan produk pada CV. Cipta jaya mengalami penurunan yang diakibatkan kurangnya promosi pada media massa. Hal ini menyebabkan produktivitas di CV. Cipta Jaya kurang efektif dan efisien untuk itu perlu dilakukan perbaikan pada lini produksi. Tujuan dalam penelitian ini adalah untuk mengetahui strategi yang efektif dalam meningkatkan produktivitas sesuai kondisi perusahaan, kemudian untuk mengetahui tingkat profitabilitas perusahaan. Metode yang digunakan adalah metode The American Produktivity Center (APC model). Hasil penelitian menunjukkan bahwa tingkat produktivitas CV. Cipta Jaya selama periode pengukuran mengalami penurunan. Hal ini dapat dilihat dari semua input secara keseluruhan pada periode 1 sebesar -39,176 periode 3 sebesar -39,176. Tingkat profitabilitas mengalami naik turun yang tidak konstan, berdasarkan perhitungan diatas bahwa penurunan produktivitas diikuti oleh penurunan profitabilitas. Hal ini terbukti dari periode 1 yang turun -17,1% dan periode 2 sebesar 59,5%. Dan naik pada periode 1 input energi sebesar 0,920 dan modal sebesar -1,205. Untuk indeks perbaikan harga mengalami kenaikan tiap tahunnya yaitu periode 1 sebesar 1,0% dan periode 2 sebesar 1,03%. CV. Cipta Jaya is a company engaged in the manufacture and assembly of aluminum boilers located on Jalan Besar Tembung N0. 11 Medan, which was founded by Mr. Daiman on May 23, 1998 with its main production being aluminum boilers. On CV. Cipta Jaya condition when working employees are often less enthusiastic and not focused during the production process. The use of machines and tools is still very simple so that the production process is not optimal. In addition, product sales at CV. Cipta Jaya experienced a decline caused by a lack of promotion in the mass media. This causes productivity in the CV. Cipta Jaya is less effective and efficient, therefore it is necessary to make improvements to the production line. The purpose of this research is to find out an effective strategy for increasing productivity according to the conditions of the company, then to find out the level of company profitability. The method used is the method of The American Productivity Center (APC model). The results showed that the productivity level of CV. Cipta Jaya during the measurement period has decreased. This can be seen from all inputs as a whole in period 1 of -39.176 period 3 of -39.176. The level of profitability fluctuates which is not constant, based on the calculation above that the decrease in productivity is followed by a decrease in profitability. This is evident from period 1 which fell -17.1% and period 2 of 59.5%. And rose in period 1 energy input of 0.920 and capital of -1.205. The price improvement index has increased every year, namely period 1 of 1.0% and period 2 of 1.03%. |
Description: | 80 Halaman |
URI: | http://repository.uma.ac.id/handle/123456789/18763 |
Appears in Collections: | SP - Industrial Engineering |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
178150026 - Khairuddin - Fulltext.pdf | Cover, Abstract, Chapter I, II, III, V, Bibliography | 1.37 MB | Adobe PDF | View/Open |
178150026 - Khairuddin - Chapter IV.pdf Restricted Access | Chapter IV | 874.51 kB | Adobe PDF | View/Open Request a copy |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.