Title: | Metode Pelaksanaan Pemasangan dan Perhitungan Struktur Tower Crane pada Proyek Pembangunan Living Plaza Medan |
Other Titles: | Implementation Method for Installing and Calculation of Tower Crane Structures in the Medan Living Plaza Development Project |
Authors: | Ndruru, Pilihan Agus |
metadata.dc.contributor.advisor: | Ardan, Melloukey Siregar, Syafiatun |
Keywords: | komponen tower crane;metode pemasangan;jarak maksimum;pondasi tower crane;tower crane components;installation method;maximum distance;tower crane foundation |
Issue Date: | 12-May-2023 |
Publisher: | Universitas Medan Area |
Series/Report no.: | NPM;168110069 |
Abstract: | Konstruksi bangunan bertingkat memerlukan alat berat untuk menaikkan dan menurunkan serta memindahkan material dari bawah ke atas, yaitu tower crane. Pada suatu pekerjaan proyek konstruksi gedung bertingkat penggunaaan tower crane sangatlah membantu dalam penyelesaiaan pekerjaan. Setiap penggunaan alat berat seperti tower crane memerlukan pelaksanaan pemasangan di tempat yang sudah direncanakan dan dipertimbangkan. Berdasarkan uraian bangunan konstruksi bertingkat tersebut dan spesifikasi alat berat berupa tower crane beserta observasi di lapangan akan ditinjau pelaksanaan pemasangan tower crane pada proyek bangunan bertingkat. Penelitian ini bertujuan untuk mengetahui metode pelaksanaan pemasangan tower crane, mendapatkan hasil perhitungan struktur komponen-komponen tower crane dan memperoleh hasil perhitungan jarak yang diperbolehkan pada lengan tower crane pada waktu pengangkatan material serta hasil analisis pada pondasi tower crane dalam mengangkat dan memindahkan material. Metode yang digunakan dalam penelitian ini adalah melakukan survei di lapangan untuk memproleh data penelitian dan mengambil data dari tim engineering proyek untuk dilakukan analisis dan perhitungan secara manual. Hasil dari perhitungan ini meliputi analisis metode pelaksanaan pemasangan tower crane menggunakan metode kerja dalam memasangkan setiap komponen-komponen tower crane. Selanjutnya hasil perhitungan pada setiap komponennya dan pondasi tower crane baik pada waktu operasional maupun tidak operasional menunjukkan aman untuk digunakan serta hasil analisis pada jib diperoleh jarak maksimum untuk mengangkat beban maksimum sebesar 10 ton agar tidak terjadi patah pada lengan tower crane yaitu sejauh 17 meter. Serta hasil perhitungan ФMn =11882.030817 kNm > 2159.751284 kNm . ФMn (momen nominal tulangan pile cap D25) > Mu (Momen ultimit Tower Crane) aman untuk digunakan. Dengan hasil perhitungan tersebut tower crane aman untuk digunakan untuk mengangkat, memindahkan dan menurunkan material bangunan. Construction building graded need tool heavy for raise and lower as well as move material from lower to top, that is tower cranes. at one work project construction building graded usage tower cranes really help in settlement job. Every use tool heavy like tower cranes need implementation installation in place planned and considered.Based on description building construction graded these and specifications tool heavy form tower cranes along with field observations will reviewed implementation installation tower crane on the project building storey . Study This aim u nto know the method of implementation of the installation tower crane, get the results of the calculation of the structure of the tower crane components and get the results of the calculation of the distance allowed on the tower crane arm when lifting material and results analysis on the foundation deep tower cranes lifting and moving materials. Method used in study This is do field survey for obtain research data and retrieve data from team project engineering for done analysis and calculation manually. Result of calculation this covers analysis method implementation installation tower cranes use method work in pair every components tower cranes. Furthernmore results calculations on each components and foundation tower cranes good on time operational nor No operational show safe for used as well as results analysis on jib obtained distance maximum For lift burden maximum as big 10 tons in order not happen broken arm _ tower cranes that is as far as 17 meters. As well as results calculation ФMn =11882.030817 kNm > 2159.751284 kNm. ФMn (nominal moment of pile cap reinforcement D25) > Mu (Ultimate moment Tower Crane) is safe for used. With results calculation the tower cranes safe for used for lifting, moving and unloading building materials. |
Description: | 101 Halaman |
URI: | https://repositori.uma.ac.id/handle/123456789/19879 |
Appears in Collections: | SP - Civil Engineering |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
168110069 - Pilihan Agus Ndruru - Fulltext.pdf | Cover, Abstract, Chapter I, II, III, V, Bibliography | 5.38 MB | Adobe PDF | View/Open |
168110069 - Pilihan Agus Ndruru - Chapter IV.pdf Restricted Access | Chapter IV | 646 kB | Adobe PDF | View/Open Request a copy |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.