Please use this identifier to cite or link to this item: https://repositori.uma.ac.id/handle/123456789/20163
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorSutrisno-
dc.contributor.authorPanjaitan, Afrizal-
dc.date.accessioned2023-07-03T11:09:25Z-
dc.date.available2023-07-03T11:09:25Z-
dc.date.issued2023-01-15-
dc.identifier.urihttps://repositori.uma.ac.id/handle/123456789/20163-
dc.description73 Halamanen_US
dc.description.abstractPenjadwalan produksi di dalam dunia industri memiliki peranan penting sebagai bentuk pengambilan keputusan. Perusahaan berupaya untuk memiliki penjadwalan yang paling efektif dan efisien sehingga dapat meningkatkan produktivitas yang dihasilkan dengan menghemat waktu penyelesaian produksi seminimal mungkin. Permasalahannya adalah perusahaan belum menerapkan suatu penjadwalan terhadap mesin-mesin produksi dengan menggunakan suatu metode penjadwalan tertentu yang sesuai dengan situasi dan kondisi mesin-mesin tersebut. Penelitian ini bertujuan untuk mengetahui basil dengan melakukan penjadwalan pekerjaanljob pada setiap mesin produksi pada bagian produksi dapat meminimumkan waktu penyelesaian produksi. Metode yang digunakan adalah metode algoritma non delay, merupakan jadwal nyata yang tidak membiarkan mesin dalam keadaan menganggur atau idle bila suatu operasi dapat dimulai,sehingga mampu menghasilkan makespan yang minimum. Hasil analisis penjadwalan dengan menggunakan metode algoritma non delay menghasilkan makes pan sebesar 257,7 me nit. Dengan menggunakan algoritma non delay makespan akan berkurang sebesar 49,58% dari waktu aktual dan meminimalkan waktu sebanyak 253,4 menit. Sehingga penjadwalan pada mesin HDPE dengan menggunakan metode algoritma non delay ini sudah optimal. Production scheduling in the industrial world has an important role as form of decision making. The company strives to have a schedule the most effective and efficient way to increase productivity produced by saving production completion time to a minimum. The problem is the company has not implemented a schedule to production machines using a scheduling method specific to the situation and condition of these machines. This research aims to find out the results by scheduling jobs/jobs on each production machine in the production section to minimize time production completion. The method used is a non-delay algorithm method, is a real schedule that does not leave the machine idle or idle when an operation can be started, so as to produce makespan the minimum. The results of the scheduling analysis using the algorithm method non delay produces makes pan of 257.7 minutes. By using the non delay makespan algorithm will be reduced by 49.58% of the actual time and minimize the time as much as 253.4 minutes. So scheduling on HDPE machine using the non delay algorithm method is already optimal.en_US
dc.language.isoiden_US
dc.publisherUniversitas Medan Areaen_US
dc.relation.ispartofseriesNPM;188150006-
dc.subjectmetode algoritmaen_US
dc.subjectnon delayen_US
dc.subjectpenjadwalanen_US
dc.subjectmakespanen_US
dc.titleUsulan Penjadwalan Mesin Produksi Pada Bagian Mesin Hdpe Dengan Menggunakan Metode Algoritma Non Delaypada Pt. Sinar Utama Nusantaraen_US
dc.title.alternativeUsulan Penjadwalan Mesin Produksi Pada Bagian Mesin Hdpe Dengan Menggunakan Metode Algoritma Non Delaypada Pt. Sinar Utama Nusantaraen_US
dc.typeThesisen_US
Appears in Collections:SP - Industrial Engineering

Files in This Item:
File Description SizeFormat 
188150006 - Afrizal Panjaitan - Fulltext.pdfCover, Abstract, Chapter I, II, III, V, Bibliography11.25 MBAdobe PDFView/Open
188150006 - Afrizal Panjaitan - Chapter IV.pdf
  Restricted Access
Chapter IV3.72 MBAdobe PDFView/Open Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.