Please use this identifier to cite or link to this item: https://repositori.uma.ac.id/handle/123456789/20989
Title: Pengendalian Alokasi Material Pada Proyek Kontruksi Pembangunan Gedung Perkantoran Kargo Bandara Kualanamu
Other Titles: Controlling Material Allocation in the Kualanamu Airport Cargo Office Building Construction Project
Authors: Risdianto
metadata.dc.contributor.advisor: Lubis, Kamaluddin
Rangkuti, Nuril Mahda
Keywords: pengendalian material;kuantitas;hasil optimal;optimal results;material control
Issue Date: 2013
Publisher: Universitas Medan Area
Series/Report no.: NPM;118110044
Abstract: Pelaksanaan proyek konstruksi merupakan suatu proses yang bersifat unik, dimana mekanismenya tidak berulang dan peka terhadap pengaruh-pengaruh dari dalam dan Juar proyek. Karenanya pengendal ian proyek, khususnya pengendal ian material untuk kon-stniksi harus mendapat -perhatian yang khusus. Tugas akhir ini membahas pengendalian material pada tahap pelaksanaan proyek, baik kondisi awal dan dapat dibandingkan terhadap pengendalian yang direncanakan oleh Kontraktor Pelaksana. Implementation of a construction project is a unique process, where the mechanism is not repetitive and is sensitive to internal influences and Champion the project. Hence project control, especially material control Special attention must be paid to construction. This final assignment discusses material control at the project implementation stage, both initial and possible conditions compared to the controls planned by the Implementing Contractor.
Description: 78 Halaman
URI: https://repositori.uma.ac.id/handle/123456789/20989
Appears in Collections:SP - Civil Engineering

Files in This Item:
File Description SizeFormat 
118110044 - Risdianto - Fulltext.pdfCover, Abstract, Chapter I, II, III, V, Bibliography5.36 MBAdobe PDFView/Open
118110044 - Risdianto - Chapter IV.pdf
  Restricted Access
Chapter IV4.86 MBAdobe PDFView/Open Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.