Title: Metode Pelaksanaan dan Pengawasan Proyek Peningkatan Jalan Siabaksa - Bakara Kec. Baktiraja Kab. Humbang Hasundutan
Other Titles: Method of Implementation and Supervision of the Siabaksa - Bakara Road Improvement Project, Kec. Baktiraja District. Humbang Hasundutan
Authors: Manullang, Johan Virgo
metadata.dc.contributor.advisor: -
Keywords: metode pelaksanaan;pengawasan;method of implementation;monitoring
Issue Date: 2013
Publisher: Universitas Medan Area
Series/Report no.: NPM;118110050
Abstract: Metode pelak:sanaan dan pengawasan merupak:an hal yang paling penting dalam melaksanak:an suatu pekerjaan dan juga hal yang diperlukan dalam memastikan wak:tu penyelesaian proyek. Dimana dalam perencanaan dan penjadwalan tersebut telah disediak:an pedoman yang spesifik untuk menyelesaikan aktivitas proyek dengan lebih cepat, tepat dan efisien. Skripsi ini secara khusus membahas bagaimana menerapkan metode pelak:sanaan dan pengawasan pelak:sanaan proyek konstruksi pada perusahaan kontrak:tor CV. Kaisar Konstruksi pada proyek Peningkatan Siabaksa - Bak:ara Kee. Baktiraja Kab. Humbang Hasundutan. Adapun penelitian dilak:ukan dengan wawancara dan studi literatur. Analisa pada studi ini meliputi penjadwalan proyek, identifikasi aktivitas, penyusunan urutan kegiatan, perkiraan kurun wak:tu, penyusunan jadwal, monitoring (pengawasan), pencatatan hasil kerja, pemak:aian sumber daya, memeriksa kualitas, kemajuan proyek di lapangan, ak:ibat yang terjadi pada tanggal penyelesaian proyek, memeriksa kemungkinan munculnya jalur kritis barn. Dari hasil analisa disimpulkan bahwa pelaksanaan manajemen wak:tu yang dilakukan oleh perusahaan kontraktor belum sepenuhnya mampu melak:sanak:an secara ideal metode pelak:sanan dan pengawasan proyek, karena masih belum sempumanya dalam melaksanakan aspek dari manajemen proyek. Pengawasan (monitoring) merupakan salah satu aspek tersulit untuk dilakukan secara akurat dan teliti dikarenakan harus adanya korelasi yang kuat antara level executive management dengan para pelaksana di lapangan. Dalam melaksanakan suatu kegiatan (proyek) hal yang paling utama yang harus diperhatikan untuk dilaksanakan yaitu : 1. Manajemen proyek, 2. Metode pelaksanaan, 3. Pengawasan (monitoring). Sebab jika salah satu dari ketiga hal diatas tidak dilaksanakan maka proyek tersebut dapat terbengkalai ataupun mengalami perubahan jadwal pelaksanaan, yang akhimya merugikan perusahaan kontraktor itu sendiri. Methods of implementation and supervision is the most important in executing a job and also it is necessary to ensure on-time project completion. Where in the planning and scheduling have been provided specific guidelines for completing the project activities more quickly, accurately and efficiently. This thesis specifically addresses how to apply the methods of implementation and supervision of the implementation of the construction project contracting company CV Kaisar Konstruksi on the project Peningkatan Siabaksa - Bakara Kee. Baktiraja Kab. Humbang Hasundutan. The research conducted by interviews and literature studies. Analysis in this study include project scheduling, identification activities, the prepa;ation of a sequence of events, the estimated period of time, scheduling, monitoring (supervision), recording the work, resource use, quality check, the progress of the project in the field, which occurs due to the project completion date , examine the possibility of the emergence of new critical path. From the analysis concluded that the implementation of time management is carried out by the contractor company has not been fully able to carry out the ideal method of Implementation and supervision of the project, because it is still not perfect in implement aspects of project management. Surveillance (monitoring) is one of the hardest aspects to be done accurately and thoroughly due to have a strong correlation between the level of executive management with the implementers on the ground. In carrying out an activity (project) the most important thing that must be considered to be implemented, namely: I. Project management; 2. Implementation methods, 3. Surveillance (monitoring). Because if one of the three things above are not implemented then the project can be abandoned or to change the implementation schedule, which ultimately hurt the company's own contractor.
Description: 49 Halaman
URI: https://repositori.uma.ac.id/handle/123456789/21220
Appears in Collections:SP - Civil Engineering

Files in This Item:
File Description SizeFormat 
118110050 - Johan Virgo Manullang - Fulltext.pdfCover, Abstract, Chapter I, II, III, V, Bibliography2.35 MBAdobe PDFView/Open
118110050 - Johan Virgo Manullang - Chapter IV.pdf
  Restricted Access
Chapter IV2.08 MBAdobe PDFView/Open Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.