Please use this identifier to cite or link to this item: https://repositori.uma.ac.id/handle/123456789/22193
Title: Analisis Daya Dukung Dan Penurunan Pondasi Bore Pile Pada Proyek Pembangunan Menara Masjid Agung Kota Medan
Other Titles: Analysis of Bearing Capacity and Settlement of Bore Pile Foundations in the Medan City Grand Mosque Tower Construction Project
Authors: Siregar, Yosafat Martupa
metadata.dc.contributor.advisor: Nurmaidah
Keywords: Bore Pile;Daya Dukung;Efisiensi Kelompok Tiang Pancang;Bearing Capacity;Efficiency of Piling Group
Issue Date: 2-Aug-2023
Publisher: Universitas Medan Area
Series/Report no.: NPM;188110146
Abstract: Pondasi merupakan bagian paling dasar struktur yang menahan dan menopang beban dari semua struktur bagian atas bangunan. Beban-beban yang terjadi pada bangunan dan di teruskan ke pondasi yang selanjutnya di transfer ke tanah. Merencanakan pondasi perlu dilakukan penyelidikan tanah (soil investigation) untuk mengetahui jenis pondasi yang akan di gunakan dan mengetahui seberapa dalam harus di letakkan dan serta mengetahui jarak antar titik pondasi.Tujuan dari penulisan ini Untuk mengetahui kapasitas daya dukung pondasi bored pile tunggal dan kelompok pada menara Masjid Agung dan mengetahui apakah kapasitas daya dukung pondasi bored pile aman terhadap beban rencana.Metodologi pengumpulan data dengan cara observasi lapangan dengan cata menganalisis data.Perhitungan penelitan menggunakan mengunakan metode mayerhoff:880,165 ton.Untuk efisiensi kelompok pondasi bore pile dengan metode seiler-Keeney:26869,677ton,metode sederhana:15130,036,metode converse- labarre: 18894,326 ton,metode los angeles:24176,372 ton,metode Field:19581,911 ton.Dari hasil perhitungan didapat yang paling efisien menggunakan metode mayerhoff sebesar 880,165 ton. The foundation is the most basic part of the structure that holds and supports the load of all the superstructures of the building. The loads that occur on the building and are forwarded to the foundation which are then transferred to the ground. Planning the foundation needs to be carried out soil investigation to find out the type of foundation that will be used and find out how deep it must be placed and also know the distance between the foundation points The purpose of this writing is to find out the bearing capacity of single bored pile foundations and groups on towers Great Mosque and find out whether the bearing capacity of the bored pile foundation is safe against the design load. The data collection methodology is by field observation by analyzing data. Research calculations use the Mayerhoff method: 880.165 tons. For the efficiency of the bore pile foundation group with the Seiler-Keeney method: 26869.677 tons Simple method: 15130.036, Converse-Labarre method: 18894.326 tons Los Angeles method: 24176.372 tons, Field method: 19581.911 tons. From the calculation results, the most efficient method was obtained using the Mayerhoff method of 880.165 tons.
Description: 83 Halaman
URI: https://repositori.uma.ac.id/handle/123456789/22193
Appears in Collections:SP - Civil Engineering

Files in This Item:
File Description SizeFormat 
188110146 - Yosafat Martupa Siregar - Chapter IV.pdf
  Restricted Access
Chapter IV828.73 kBAdobe PDFView/Open Request a copy
188110146 - Yosafat Martupa Siregar - Fulltext.pdfCover, Abstract, Chapter I, II, III, V, Bibliography2.68 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.