dc.description59 Halamanen_US
dc.description.abstractUMKM Rumah Briket merupakan salah satu UMKM di Kota Medan yang bergerak di bidang produksi Briket Arang. Permasalahan pada UMKM ini adalah adanya pengurangan produktivitas dari karyawanlpekerja karena tidak sesuainya aliran proses produksi dengan penataan letak tiap Stasiun yang ada. Seperti dari stasiun pencetakan ke pengeringan yang memerlukan waktu sekitar ± 3,5 menit sekali jalan. Dari stasiun pengeringan ke pengemasan yang memerlukan waktu ± 5 menit. Berdasarkan Pennasalahan tersebut Penelitian ini bertujuan untuk merancang ulang tata letak fasilitas dengan menggunakan metode Computerized Relationship Layout Planning (CORELAP), dilakukan menggunakan hubungan antara Activity Relationship Chart (ARC), selanjutnya melakukan perbitungan Total Closeness Rating (TCR). Kemudian menggunakan aplikasi CORELAP 1.0 untuk mendapatkan basil yang terbaik. Dari basil perancangan Layout usulan dengan menggunakan metode Computerized Relationship Layout Planning (CORELAP) yang mampu untuk meninimalisasikan jarak dan waktu antara depru1emen. Pada layout awal tini produksi mempunyai total luas area sebesar 28,30 m1 dengan total jarak untuk material handling sebesar 41 m. Setelah dilakukan analisis untuk perancangan tata letak fasilitas dengan menggunakan metode CORELAP maka diperoleh basil usulan sebesar 28 m, serta terdapat perubahan yang dilakukan. Dari basil akhir layout produksi terdapat penurunan waktu angkut secara signifikan yaitu sebesar 360 detik dari layout awal selama 1370 detik menjadi 1010 detik pada final layout. Briquette House MSME is one of the MSMEs in Medan City engaged in the production of Charcoal Briquettes. The problems with MSMEs are: there is a reduction in productivity of employees due to non-compliance flow of the production process with the layout of each existing station. Like from printing station to drying which takes approximately ± 3.5 minutes one-way. From the drying station to packaging which takes ± 5 minute. Based on these problems, this research aims to redesigning the facility layout using computerized methods Relationship Layout Planning (CORELAP), carried out using relationships between the Activity Relationship Chart (ARC), then carry out calculations Total Closeness Rating (TCR). Then use the CORELAP 1.0 application to get the best basil. From the design results of the proposed layout using the Computerized Relationship Layout Planning method (CORELAP) which is able to minimize the distance and time between depru1ement. In the initial layout the production line has a total area of 28.30 m1 with a total distance for material handling of 41 m. After analysis is carried out to design the facility layout using CORELAP method, the proposed result is 28 m, and there are changes made. From the final results of the production layout there was a decline transport time significantly, namely 360 seconds from the initial layout during 1370 seconds becomes 1010 seconds in the final layout.en_US
dc.language.isoiden_US
dc.publisherUniversitas Medan Areaen_US
dc.relation.ispartofseriesNPM;188150051-
dc.subjectPerencanaan U/ang Tata Letak Fasilitasen_US
dc.subjectEfisiensien_US
dc.subjectRe-planning Facility Layouten_US
dc.subjectComputerized Relationship Layout Planningen_US
dc.titlePerancangan Tata Letak Fasilitas Produksi Menggunakan Metode Computerized Relationship Layout Planning (Corelap) Di Umkm Rumah Brikeen_US
dc.title.alternativeProduction Facility Layout Design Using the Computerized Relationship Layout Method Planning (Corelap) in Brike House Umkmen_US
dc.typeThesisen_US
Appears in Collections:SP - Industrial Engineering

Files in This Item:
File Description SizeFormat 
188150051 - Josua Nadeak - Fulltext.pdfCover, Abstract, Chapter I, II, III, V, Bibliography1.28 MBAdobe PDFView/Open
188150051 - Josua Nadeak - Chapter IV.pdf
  Restricted Access
Chapter IV736.68 kBAdobe PDFView/Open Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.