Please use this identifier to cite or link to this item: https://repositori.uma.ac.id/handle/123456789/22245
Title: Analisis Biaya Kayu Jati Untuk Memenuhi Standar Bahan Baku Pada Ud. Hari Perabot Dengan Metode Variabel Costing (Studi Kasus : UD. Hari Perabot)
Other Titles: Teak Wood Cost Analysis to Fulfill Raw Material Standards at Ud. Furniture Day With the Variable Costing Method (Case Study: UD. Perabot Day)
Authors: Sitorus, Icuk Rogabe Martua
metadata.dc.contributor.advisor: Munthe, Sirmas
Prasetyo, Healthy Aldriany
Keywords: biaya kayu jati;analisis biaya bahan baku;variabel costin;analysis of raw material costs
Issue Date: 31-Aug-2023
Publisher: Universitas Medan Area
Series/Report no.: NPM;188150060
Abstract: Biaya produksi terdiri dari biaya bahan baku, biaya tenaga kerja langsung, dan biaya overhead pabrik. Menurut bahan langsung adalah bahan yang digunakan untuk produksi yang dapat diidentifikasikan dengan produk, mudah ditelusur ke produk, Dalam suatu kegiatan produksi perusahaan harus dapat mempertimbangkan biaya yang terdapat didalamnya salah satunya adalah biaya bahan baku. Biaya bahan baku harus dapat diefisienkan agar tidak terjadi pemborosan dalam penggunaan bahan baku, cara yang digunakan yaitu dengan analisis selisih biaya bahan baku. Untuk mengetahui perhitungan alokasi biaya produksi untuk memenuhi standart bahan baku yang di perlukan di UD. Hari Perabot . Untuk mengetahui perhitungan biaya produksi dengan menggunakan metode Variabel costing di UD. Hari Perabot. Metode pembiayaan variable atau variable costing atau dikenal juga dengan nama direct costing adalah metode penentuan harga pokok produksi yang hanya membebankan biaya-biaya produksi variabel saja ke dalam harga pokok produksi sedangkan biaya tetap dianggap sebagai biaya periodik. Production costs consist of raw material costs, direct labor costs, and factory overhead costs. According to direct materials are the materials used for production that can be identified with the product, easy to trace to product, In a production activity the company must be able to considering the costs contained in it, one of which is the cost raw material. Raw material costs must be streamlined so that this does not occur waste in the use of raw materials, the method used is by analysis of differences in raw material costs. To find out the calculation of cost allocation production to meet the raw material standards required at UD. Day Furniture. To find out the calculation of production costs using Variable costing method at UD. Furniture Day. Variable financing method or Variable costing or also known as direct costing is a method determining the cost of production which only charges production costs only variables are included in the cost of production while fixed costs are considered as a periodic expense.
Description: 49 Halaman
URI: https://repositori.uma.ac.id/handle/123456789/22245
Appears in Collections:SP - Industrial Engineering

Files in This Item:
File Description SizeFormat 
188150060 - Icuk Rogabe Martua Sitorus - Fulltext.pdfCover, Abstract, Chapter I, II, III, V, Bibliography977.31 kBAdobe PDFView/Open
188150060 - Icuk Rogabe Martua Sitorus - Chapter IV.pdf
  Restricted Access
Chapter IV253.26 kBAdobe PDFView/Open Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.