Please use this identifier to cite or link to this item:
https://repositori.uma.ac.id/handle/123456789/22372
Title: | Analisa Ruang Bakar Boiler Kapasitas UAP 20 Ton/Jam |
Other Titles: | Analysis of Boiler Combustion Room with Steam Capacity 20 Tons/Hour |
Authors: | H, Yonaldo Erlandi |
metadata.dc.contributor.advisor: | Nst, Amirsyam Siregar, Amru |
Keywords: | Ruang Bakar Boiler Kapasitas UAP 20 Ton/Jam;Boiler Combustion Room STEAM Capacity 20 Tons/Hour |
Issue Date: | 2011 |
Publisher: | Universitas Medan Area |
Series/Report no.: | NPM;098130006 |
Abstract: | Peningkatan kebutuhan akan energi yang semakin tinggi setiap tahunnya membutuhkan perhatian yang serius dalam penanganan dan perhitungannya. The increasing demand for energy every year requires serious attention in handling and calculating it. |
Description: | 60 Halaman |
URI: | https://repositori.uma.ac.id/handle/123456789/22372 |
Appears in Collections: | SP - Mechanical Engineering |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
098130006 - Yonaldo Erlandi H - Fulltext.pdf | Cover, Abstract, Chapter I, II, III, V, Bibliography | 6.53 MB | Adobe PDF | View/Open |
098130006 - Yonaldo Erlandi H - Chapter IV.pdf Restricted Access | Chapter IV | 3.15 MB | Adobe PDF | View/Open Request a copy |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.