Please use this identifier to cite or link to this item:
https://repositori.uma.ac.id/handle/123456789/22376
Title: | Mempercepat Jadwal Penyelesaian Proyek Konstruksi |
Other Titles: | Accelerate Construction Project Completion Schedules |
Authors: | Husin, Muhammad |
metadata.dc.contributor.advisor: | Irwan Arda, Melloukey |
Keywords: | Jadwal Penyelesaian Proyek Konstruksi;Construction Project Completion Schedule |
Issue Date: | 2006 |
Publisher: | Universitas Medan Area |
Series/Report no.: | NPM;988110003 |
Abstract: | Pekerjaan kontruksi memerlukan suatu manajemen yang baik dalam perencanaan dan pelaksanaan agar penyimpangan-penyimpangan dari rencana semula dapat dihindari, sehingga tercapai suatu hasil yang diharapkan. Construction work requires good management in planning and implementation to prevent deviations from the original plan can be avoided, so that a good result is achieved expected. |
Description: | 86 Halaman |
URI: | https://repositori.uma.ac.id/handle/123456789/22376 |
Appears in Collections: | SP - Civil Engineering |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
988110003 - Muhammad Husin - Fulltext.pdf | Cover, Abstract, Chapter I, II, III, V, Bibliography | 4.93 MB | Adobe PDF | View/Open |
988110003 - Muhammad Husin - Chapter IV.pdf Restricted Access | Chapter IV | 441.43 kB | Adobe PDF | View/Open Request a copy |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.