dc.description55 Halamanen_US
dc.description.abstractPT. ATMINDO yang terletak di jalan K.L. Yos Sudarso No. 100 Medan diresmikan pada tanggal 24 Maret 1972 berdasarkan surat keputusan menteri Perindustrian No. 102 /M/SK/III/1971, tentang pemberian izin pembuatan alatalat pertanian, peralatan pengolahan hasil perkebunan dan boiler di Sumatera Utara. Lingkup pekerjaan yang dijalankan PT. A TMINDO bersifat pekerjaan pesanan ataujob order. Dalam pelak:sanaan kegiatan-kegiatan pabrik dibutuhkan tenaga-kerja yang mempunyai tanggung jawab terhadap pelaksanaan tugasnya dan mempunyai keahlian dalam bidangnya masing-masing. Perhitungan dan penggunaan waktu yang cermat akan mendukung penjadwalan kerja yang telah dibuat untuk setiap proses pekerjaan. Sebab bila penggunaan waktu pekerjaan yang tidak terkendali bukan saja penjadwalan kerja yang akan meleset tetapi juga akan sangat mempengaruhi terhadap biaya dengan timbulnya kerugian finansial. Tugas akhir ini bertujuan mengukur waktu standard untuk pemakaian kawat las ( elektrode) pada pekerjaan pengelasan yang dilakukan pada boiler pipa api 5.0 SAT/ 10 Bar. Dengan cara pengamatan langsung pemakaian kawat las (elektrode) pada pekerjaan pengelasan dengan metode Stop Watch Time Study maka dengan menggunakan waktu standard dapat ditentukan berapa jumlah waktu yang dibutuhkan dalam 1 batang pemakaian kawat las ( elektrode) serta diketahui berapa penyambungan pengelasan yang didapat dalam jam produksi. Pendekatan masalah yang dipergunakan dalam penyelesaian ini adalah sebagai berikut : 1. Menentukan waktu standard dari pemakaian kawat las ( elektrode) pada pekerjaan pengelasan yang diamati secara langsung dengan menggunakan metode Stop Watch Time Study dan memakai sistem rating factor dan allowance. 2. W aktu standard yang didapat dari pengamatan pemakaian kawat las (elektrode) pada pekerjaan pengelasan Boiler Pipa Api 5.0 SAT/ 10 Bar, adalah: - Pemakaian satu batang kawat las (elektrode) OK. 53.04 AWSA5.1E7016 diameter 2,6 mm, waktu standard yang didapat adalah 261 ,97 detik. - Pemakaiansatu batang kawat las (elektrode) OK. 53.04 AWSA5.1 E 7016 diameter 3,25 mm, waktu standard yang didapat adalah 445,67 detik. Pemakaian satu batang kawat las (elektrode) OK. 53.04 AWS AS.I E 7016 diameter 4 mm, waktu standard yang didapat adalah 437,01 detik. 3. Jumlah sambungan pengelasan yang diperoleh dari perhitungan waktu standard adalah : Penyambungan dengan menggunakan kawat las ( elektrode) diameter 2,6 mm adalah 22 sambungan yang sebelumnya 20 sambungan. - Penyambungan dengan menggunakan kawat las (elektrode} diameter 3,25 mm adalah 13 sambungan yang sebelumnya 11 sambungan. - Penyambungan dengan menggunakan kawat las ( elektrode) diameter 4 mm adalah 13 sambungan yang sebelumnya 12 sambungan. PT. ATMINDO atjalan K.L. Yos Sudarso no. 100 Medan estabilisment on March 24th, 1972 based on Minister of Industrial affairs No. 102/M/SK/111/1973 about licensing for manufacture the farming equipment, proccessing equitment for the plantation produce and the boiler in North Sumatera. PT. ATMINDO's product base on job order. For manufacturing procces needs skill and responsibility worker to do the activities in using time and exact calculation will support in schedule proccess which was made for each component. On the contrarary, if using time hours not stable will cause not only in schedule time and also effect the cost of the company. The purpose of the thesis is meassure the standard time for using the electrode on the firing tube boiler 5.0. SAT/10 BAR in welding procces. The directly research for using the electrode in welding procces by using stop watch time study method and using standard time formula, the time which's needed in using one piece the electrode and how many to join the welding procces in productive time will be known. The method to solve the metier are : 1. Determining standard time for using the elecrode of welding procces which's done directly research by using stop wacth time study method and using the ratting factor system and allowance. 2. The standard time which's got from the research for using the electrode on the firing tubes boiler 5.0 SAT /10 BAR in the welding procces, are: By using one piece the electrode OK. 53.04 AWS. AS.l E 7016 diameter 2,6 mm, the standard time is 261,97 second. By using one piece the electrode OK. 53.04 AWS. AS.I E 7016 diameter 3,25 mm, the standard time is 445,67 second. By using one piece the electrode OK. 53.04 AWS. A5.l E 7016 diameter 4 mm, the standard time is 437,01 second. 3. After counting the standard time of welding procces are : By using the electrode diameter 2,6 mm get 22 joinning. By using the electrode diameter 3,25 mm get 13 joinning. By using the electrode diameter 4 mm get 13 joinning.en_US
dc.language.isoiden_US
dc.publisherUniversitas Medan Areaen_US
dc.relation.ispartofseriesNPM;018150016-
dc.subjectpengukuran waktu standarden_US
dc.subjectpemakaian kawat lasen_US
dc.subjectpekerjaan pengelasan boiler pipa api 5.0sat/10 baren_US
dc.subjectstandard timeen_US
dc.subjectwelding wire usageen_US
dc.subject5.0sat/10 bar fire pipe boiler welding worken_US
dc.titlePengukuran Waktu Standard untuk Pemakaian Kawat Las pada Pekerjaan Pengelasan Boiler Pipa Api 5.0sat/10 Baren_US
dc.title.alternativeMeassurement Of Standard Time For Using The Electrode On The Firing Tubes Boiler 5.0 Sat/10 Bar In Welding Proccessen_US
dc.typeSkripsi Sarjanaen_US
Appears in Collections:SP - Industrial Engineering

Files in This Item:
File Description SizeFormat 
018150016 - Julhamri - Fulltext.pdfCover, Abstract, Chapter I, II, III, V, Bibliography8.7 MBAdobe PDFView/Open
018150016 - Julhamri - Chapter IV.pdf
  Restricted Access
Chapter IV8.13 MBAdobe PDFView/Open Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.