Please use this identifier to cite or link to this item:
https://repositori.uma.ac.id/handle/123456789/22633
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.advisor | Mustafa, Kamil | - |
dc.contributor.advisor | Banjarnahor, M. | - |
dc.contributor.author | Nainggolan, Taruli | - |
dc.date.accessioned | 2024-01-11T03:24:48Z | - |
dc.date.available | 2024-01-11T03:24:48Z | - |
dc.date.issued | 2004-08 | - |
dc.identifier.uri | https://repositori.uma.ac.id/handle/123456789/22633 | - |
dc.description | 146 Halaman | en_US |
dc.description.abstract | Dari hasil data diatas dapat diambil beberapa kesirnpulan : 1. Bahan baku dapat tersedia tepat waktu sehingga dapat menghindari keterlambatan pengirirnan produk. 2. Dapat menggunakan bahan baku seoptimal mungkin dalarn memenuhi permintaan pelanggan. 3. Adanya jadwal produksi yang tepat sehingga dapat mengoptimalkan tenaga kerja di dalam rnelakukan produksi sesuai dengan permintaan pelanggan. 4. Memberikan kepuasan terhadap pelanggan dengan ketepatan pengiriman produk. From the data above, the writer can concludes that : 1. Complete materials can be available on time to ignore the lateness of product dispacth. 2. Complete materials can be used as maximum as possible to full fill customer order. 3. Available on production schedule time can be maximum man - power in doing production based on customer order. 4. Giving costumer statis:fy by sending goods with order on time. | en_US |
dc.language.iso | id | en_US |
dc.publisher | Universitas Medan Area | en_US |
dc.relation.ispartofseries | NPM;008150036 | - |
dc.subject | perencanaan produksi dan kebutuhan bahan baku | en_US |
dc.subject | produk aluminium batangan (billet) | en_US |
dc.subject | metode mrp | en_US |
dc.subject | production planning and raw material requirements | en_US |
dc.subject | Aluminum products bars (billets) | en_US |
dc.subject | mrp method | en_US |
dc.title | Perencanaan Produksi dan Kebutuhan Bahan Baku Produk Aluminium Batangan (Billet) dengan Metode Mrp di PT. Cakra Compact Aluminium Industries Medan | en_US |
dc.title.alternative | Production Planning and Raw Material Needs of Aluminum Bars (Billets) Products with Mrp Method in PT. Cakra Compact Aluminum Industries Medan | en_US |
dc.type | Skripsi Sarjana | en_US |
Appears in Collections: | SP - Industrial Engineering |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
008150036 - Taruli Nainggolan - Fulltext.pdf | Cover, Abstract, Chapter I, II, III, Bibliography | 3.51 MB | Adobe PDF | View/Open |
008150036 - Taruli Nainggolan - Chapter IV.pdf Restricted Access | Chapter IV-VII | 5.58 MB | Adobe PDF | View/Open Request a copy |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.