Please use this identifier to cite or link to this item:
https://repositori.uma.ac.id/handle/123456789/22643
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.advisor | Mustafa, Kamil | - |
dc.contributor.advisor | Batubara, Akri Adil | - |
dc.contributor.author | Zulianto | - |
dc.date.accessioned | 2024-01-11T08:20:18Z | - |
dc.date.available | 2024-01-11T08:20:18Z | - |
dc.date.issued | 2002 | - |
dc.identifier.uri | https://repositori.uma.ac.id/handle/123456789/22643 | - |
dc.description | 95 Halaman | en_US |
dc.description.abstract | Perencanaan produksi didasarkan pada perkiranaan hasil panen dengan metode peramalan berdasarkan umur tanaman dan luas areal. Kapasitas yang tersedia didasarkan pada kapasitas stasiun perebusan. Production planning is based on crop yield estimates with a forecasting method based on plant age and area area. Available capacity is based on the capacity of the boiling station. | en_US |
dc.language.iso | id | en_US |
dc.publisher | Universitas Medan Area | en_US |
dc.relation.ispartofseries | NPM;898150032 | - |
dc.subject | Produksi Pabrik Kelapa Sawit | en_US |
dc.subject | Palm Oil Factory Production | en_US |
dc.title | Perencanaan Produksi Pabrik Kelapa Sawit Berdasarkan Perkiraan Hasil Panen Pada PT. Perkebunan Nusantara IV Kebun Pasir Mandoge | en_US |
dc.title.alternative | Palm Oil Factory Production Planning Based on Estimated Harvest Results at PT. Perkebunan Nusantara IV Kebun Pasir Mandoge | en_US |
dc.type | Thesis | en_US |
Appears in Collections: | SP - Industrial Engineering |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
898150032 - Zulianto - Chapter IV.pdf Restricted Access | Chapter IV | 2.5 MB | Adobe PDF | View/Open Request a copy |
898150032 - Zulianto - Fulltext.pdf | Cover, Abstract, Chapter I, II, III, V, Bibliography | 4.92 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.