Title: Analisis Pengukuran Waktu Dengan Metode Time Study Studi Kasus Pada Proses Produksi Ud.Zahira Shoes
Other Titles: Time Measurement Analysis Using Time Study Method Case Study on Ud.Zahira Shoes Production Process
Authors: Dohar, Robi
metadata.dc.contributor.advisor: Rizkullah, Alifia
Keywords: Time Study Method;Shoe and Sandal Manufacturing Industry;Normal Time;Standard Time;Metode Time Study;Industri Manufaktur Sepatu dan Sandal;Waktu Normal
Issue Date: Nov-2025
Publisher: Universitas Medan Area
Series/Report no.: NPM;198150089
Abstract: UD. Zahira Shoes adalah home industry yang bergerak di bidang manufaktur yaitu produksi sepatu dan sandal. Dalam kegiatan produksi produknya, UD. Zahira Shoes melibatkan 9 orang untuk mengerjakan setiap Langkah pembuatannya mulai dari stasiun kerja bagian penapakan, stasiun kerja bagian press tapak hingga ke stasiun kerja packing, karyawan UD. Zahira Shoes bekerja dari mulai pukul 10.00 WIB pagi hingga 10.00 WIB malam dengan 2 jam istirahat, bekerja selama 6 hari dalam seminggu, namun di hari minggu karyawan diberi kebebasan untuk bekerja di pukul berapa. Dengan hasil produksi 36 unit selama seminggu, untuk menghindari keterlambatan, dihasilkan perhitungan waktu normal sebesar 242,92 detik/unit , waktu baku 250,2 detik/unit dan output standard 326,52 detik/unit. Dalam kegiatan produksi manufaktur sangat dibutuhkan kepastian mengenai waktu yang dihabiskan para pekerja dan berapa tinkat produktivitas yang dimiliki dan apakah setelah perbaikan dapat meningkatkan produktivitas dari UD. Zahira Shoes. UD. Zahira Shoes is a home industry operating in the manufacturing sector, specifically producing shoes and sandals. In its production activities, UD. Zahira Shoes involves 9 workers to handle each step of the production process, from the preparation station, the sole pressing station, to the packing station. Employees of UD. Zahira Shoes work from 10:00 AM to 10:00 PM with a 2-hour break, working 6 days a week, while on Sundays they are given the freedom to work at any time. With a production result of 36 units per week, to avoid delays, a normal time calculation of 242.92 seconds/unit was produced, while the time for delays was 250.2 seconds/unit and the output standard was 326.52 seconds/unit. In the manufacturing production activities, it is necessary to ensure the time spent by workers and how much productivity they have and whether improvements are needed to increase the productivity of UD. Zahira Shoes.
Description: 14 Halaman
URI: https://repositori.uma.ac.id/handle/123456789/27468
Appears in Collections:SP - Industrial Engineering

Files in This Item:
File Description SizeFormat 
198150089 - Robi Dohar - Fulltext.pdfFulltext835.71 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.