Please use this identifier to cite or link to this item:
https://repositori.uma.ac.id/handle/123456789/27611
Title: | Implementasi Sistem Kelistrikan Tanpa Kedip Berbasis Keandalan pada Gedung Futsal Sumatera Utara |
Other Titles: | Implementation of Reliability-Based Flicker-Free Electrical System in North Sumatra Futsal Building |
Authors: | Bulawolo, Urtat Bayu Ajis |
metadata.dc.contributor.advisor: | Siregar, Muhammad Fadlan |
Keywords: | Electrical Stability;Futsal Building;Load backup;Back Up Beban;Gedung Futsal;Kestabilan Listrik |
Issue Date: | 2025 |
Publisher: | Universitas Medan Area |
Series/Report no.: | NPM;188120071 |
Abstract: | Pekan Olahraga Nasional (PON) adalah salah satu acara olahraga yang terbesar di Indonesia yang di adakan setiap empat tahun sekali. Aceh dan Sumatera Utara merupakan penyelenggara PON ke-XXI 2024. Penyelenggaraan PON di wilayah Sumatera Utara merupakan perhatian khusus oleh semua pihak. PT. PLN (Persero) UP3 Medan Utara mengambil bagian dalam menjaga kestabilan listrik saat kegiataan PON, UP3 Medan Utara melakukan sistem keandalan kelistrikan tanpa kedip yaitu dengan memback up beban, dan untuk mengetahui jumlah kebutuhan beban yang di supply dan mengetahui fungsi masing-masing unit peralatan listrik yang digunakan dari hasil pengukuran daya terpasang pada gedung adalah 41.500 Watt, trafo 400 kVA, UPS 40 kVA, Genset 100 kVA dan UGB 250 kVA. Dari hasil pengukuran yang dilakukan di dapatkan nilai pengukuran kabel R ( I = 36,17 dan F = 50,20 Hz), S ( I = 15,22 dan F = 50,21 Hz), T ( I = 24,48 dan F = 50,21 Hz) dan N ( I = 25,46 dan F = 50,19 Hz). The National Sports Week (PON) is one of the largest sporting events in Indonesia held every four years. Aceh and North Sumatra are the organizers of the XXI PON 2024. The implementation of PON in the North Sumatra region is a special concern by all parties. PT PLN (Persero) UP3 Medan Utara takes part in maintaining electricity stability during PON activities, UP3 Medan Utara conducts an electricity reliability system without blinking, namely by backing up the load, and to find out the number of load requirements that are supplied and know the function of each unit of electrical equipment used from the measurement of installed power in the building is 41,500 Watts, 400 kVA transformer, 40 kVA UPS, 100 kVA generator and 250 kVA UGB. From the results of measurements taken in getting the value of cable measurements R (I = 36.17 and F = 50.20 Hz), S (I = 15.22 and F = 50.21 Hz), T (I = 24.48 and F = 50.21 Hz) and N (I = 25.46 and F = 50.19 Hz). |
Description: | 5 Halaman |
URI: | https://repositori.uma.ac.id/handle/123456789/27611 |
Appears in Collections: | SP - Electrical Engineering |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
188120071 - Urtat Bayu Ajis Bulawolo - Fulltext.pdf | Fulltext | 355.75 kB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.