Please use this identifier to cite or link to this item:
https://repositori.uma.ac.id/handle/123456789/31373| Title: | Pengamatan Pekerjaan Balok pada Proyek Pembangunan Gedung SMA Sekolah Rakyat di JL. Flamboyan II, Medan |
| Other Titles: | Observation of Beam Construction Work at the Sekolah Rakyat High School Building Project on Jalan Flamboyan II, Medan |
| Authors: | Ramadhan, Bimbim Dhuha |
| metadata.dc.contributor.advisor: | Kurniawan, Freddy |
| Keywords: | Laporan Kerja Praktik;Pengamatan Pekerjaan Balok pada Proyek Pembangunan Gedung SMA Sekolah Rakyat di JL. Flamboyan II, Medan |
| Issue Date: | Jun-2026 |
| Publisher: | Universitas Medan Area |
| Series/Report no.: | NPM;238110011 |
| Abstract: | Dalam pelaksanaannya, penulis mendapatkan kesempatan untuk melakukan kerja praktek di proyek pembangunan Gedung SMA Sekolah Rakyat di Jl. Flamboyan II, Medan, bersama PT. Nindya Karya– FYP KSO Proyek ini memberikan ruang bagi penulis untuk terlibat secara langsung dalam proses pembangunan struktur bangunan secara menyeluruh, mulai dari Pondasi, Kolom, Balok, Pelat Lantai, hingga elemen Struktural lainnya. Penyusunan laporan ini dimaksudkan untuk mendokumentasikan pengalaman kerja praktek secara terstruktur sebagai bentuk pemenuhan kewajiban akademis. Laporan ini diharapkan mampu menyajikan gambaran nyata mengenai tahapan pelaksanaan pekerjaan Kolom di lapangan, sekaligus diharapkan akan menjadi bekal penting dalam pengembangan kompetensi sebagai calon engineer di bidang konstruksi. During the course of this practical work, the author had the opportunity to participate in the construction project for the SMA Sekolah Rakyat building on Jalan Flamboyan II, Medan, in collaboration with PT. Nindya Karya–FYP KSO. This project allowed the author to be directly involved in the comprehensive structural construction process, covering everything from foundations, columns, beams, and floor slabs to other structural elements. This report aims to document the practical work experience in a structured manner as a requirement for fulfilling academic obligations. It is intended to provide a realistic overview of the on-site column construction stages and serve as a valuable asset for developing the competencies required to become a construction engineer. |
| Description: | 57 Halaman |
| URI: | https://repositori.uma.ac.id/handle/123456789/31373 |
| Appears in Collections: | Laporan Kerja Praktik (LKP) |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| LKP - Bimbim Dhuha Ramadhan - 238110011 - Fulltext.pdf | LKP Fulltext | 1.74 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.