Please use this identifier to cite or link to this item: https://repositori.uma.ac.id/handle/123456789/22239
Title: Rancang Bangun Sistem Warning pada Jalur Perlintasan Kereta Api Berbasis Outseal PLC
Other Titles: Design and Development of a Warning System on a Railway-Based Crossing Line Outseal PLC
Authors: Fajaruddin, M.
metadata.dc.contributor.advisor: Mungkin, Moranain
Keywords: outseal PLC;otomatisasi perlintasan kereta api;sensor photoelektrik;railway crossing automation;photoelectric sensor
Issue Date: Sep-2023
Publisher: Universitas Medan Area
Series/Report no.: NPM;188120035
Abstract: Kecelakaan lalu lintas di perlintasan kereta api sering kali menimbulkan risiko serius karena tidak adanya pintu palang perlintasan yang otomatis. Penelitian ini bertujuan untuk mengembangkan dan menguji sistem otomatisasi palang pintu perlintasan kereta api menggunakan Outseal PLC dengan sumber daya dari panel surya mini dan adaptor AC ke DC dengan baterai sebagai penyimpanan energi. Metode penelitian mencakup perencanaan sistem dan eksperimen. Hasil penelitian menunjukkan bahwa sistem ini dapat berfungsi sebagai sistem peringatan di perlintasan kereta api. Sensor photoelektrik yang terpasang pada jarak 57 cm dan 52 cm dari palang perlintasan memberikan respons yang efektif. Ketika kereta mendekati sensor pertama, sistem Outseal mengaktifkan palang perlintasan, dan saat kereta menjauhi sensor kedua, palang perlintasan dibuka. Waktu yang dibutuhkan untuk menutup dan membuka palang perlintasan adalah 6 detik. Selama pengisian baterai selama 70 menit, voltase awal adalah 12,4 volt dan akhirnya adalah 11,8 volt. Dalam pengujian pemakaian selama 60 menit dengan pengisian baterai selama 120 menit, voltase awal adalah 12,4 volt dan akhirnya adalah 11,7 volt. Kapasitas arus yang dapat ditangani oleh Outseal hanya 500 mA, sehingga penggunaan relay eksternal disarankan untuk beban yang memerlukan arus tinggi, seperti kontraktor DC dan motor DC. Penelitian ini bertujuan untuk meningkatkan keamanan dan efisiensi di perlintasan kereta api. Traffic accidents at railway crossings often pose serious risks due to the lack of automated level crossing gates. This study aims to develop and test an automated railway crossing gate system using Outseal PLC, powered by a mini solar panel and an AC to DC adapter with battery storage. The research methodology involves system planning and experimentation. The results of the study demonstrate that this system functions effectively as a warning system at railway crossings. Photoelectric sensors placed at distances of 57 cm and 52 cm from the crossing gate provide efficient responses. When a train approaches the first sensor, the Outseal system activates the crossing gate, and when the train moves away from the second sensor, the gate opens. The time required for closing and opening the crossing gate is 6 seconds. During a 70-minute battery charging cycle, the initial voltage is 12.4 volts, which decreases to 11.8 volts at the end. In a 60-minute usage test with a 120-minute battery charging cycle, the initial voltage is 12.4 volts, decreasing to 11.7 volts at the end. The Outseal PLC can handle a maximum current capacity of only 500 mA, thus requiring the use of an external relay for high-current applications, such as DC contactors and DC motors. This research aims to enhance safety and efficiency at railway crossings.
Description: 50 Halaman
URI: https://repositori.uma.ac.id/handle/123456789/22239
Appears in Collections:SP - Electrical Engineering

Files in This Item:
File Description SizeFormat 
188120035 - M. Fajaruddin Fulltext.pdfCover, Abstract, Chapter I, II, III, V, Bibliography1.39 MBAdobe PDFView/Open
188120035 - M. Fajaruddin Chapter IV.pdf
  Restricted Access
Chapter IV836.1 kBAdobe PDFView/Open Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.