Please use this identifier to cite or link to this item:
https://repositori.uma.ac.id/handle/123456789/22492
Title: | Studi Kelayakan Perencanaan Pendirian Pabrik Kelapa Sawit Kapasitas 30 Ton TBS/Jam |
Other Titles: | Feasibility Study on Planning to Establish a Palm Oil Factory with a Capacity of 30 TBS/Hour |
Authors: | Suwandi, Winda Pratiwi |
metadata.dc.contributor.advisor: | Hanizah Panjaitan, Nismah |
Keywords: | studi kelayakan;pabrik kelapa sawit;harga mesin dan peralatan pks;pks machine and equipment prices;palm oil factory;feasibility study |
Issue Date: | 2014 |
Publisher: | Universitas Medan Area |
Series/Report no.: | NPM;108150005 |
Abstract: | Kelapa sawit merupakan salah satu primadona tanaman perkebunan yang menjadi salah satu penghasil devisa non-migas bagi Indonesia. Cerahnya prospek komoditi minyak kelapa sawit dalam perdagangan minyak nabati dunia mendorong pemerintah Indonesia untuk mengembangkan industri kelapa sawit secara terintegratif (agroindustri). Pengembangan industri kelapa sawit sebagai proses unhtk meningkatkan added value bagi produk-produk yang berbasiskan kelapa sawit, didukung oleh kebijakan-kebijakan pemerintah seperti program revitalisasi perkebunan 2006-2010 (Departemen Pettanian,2006) dan subsisdi investasi untuk perkebunan (Departemen Keuangan,2006). Oil palm is one of the favorite plantation crops that is wrong a non-oil and gas foreign exchange earner for Indonesia. Bright prospects for oil commodities palm oil in the world vegetable oil trade encourages the Indonesian government to develop the palm oil industry in an integrated manner (agro-industry). Development of the palm oil industry as a process to increase added value for palm oil-based products, supported by policies government such as the 2006-2010 plantation revitalization program (Department Pettanian, 2006) and investment subsidies for plantations (Ministry of Finance, 2006). |
Description: | 94 Halaman |
URI: | https://repositori.uma.ac.id/handle/123456789/22492 |
Appears in Collections: | SP - Industrial Engineering |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
108150005 - Winda Pratiwi Suwandi - Fulltext.pdf | Cover, Abstract, Chapter I, II, III, V, Bibliography | 5.21 MB | Adobe PDF | View/Open |
108150005 - Winda Pratiwi Suwandi - Chapter IV.pdf Restricted Access | Chapter IV | 2.7 MB | Adobe PDF | View/Open Request a copy |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.