Please use this identifier to cite or link to this item: https://repositori.uma.ac.id/handle/123456789/10948
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorSiregar, Ninny-
dc.contributor.advisorDelvika, Yuana-
dc.contributor.authorWarizki, Andi-
dc.date.accessioned2019-10-29T03:50:59Z-
dc.date.available2019-10-29T03:50:59Z-
dc.date.issued2019-04-
dc.identifier.urihttp://repository.uma.ac.id/handle/123456789/10948-
dc.descriptionPabrik Kelapa Sawit Kebun Sei Intan PT. Perkebunan Nusantara V Riau merupakan perusahaan yang bergerak dalam bidang pengolahan kelapa sawit. Perusahaan selalu mengalami permasalahan yang berhubungan dengan efisiensi mesin yang diakibatkan tidak tepatnya penanganan dan pemeliharaan mesin produksi. Hal ini dapat terlihat pada kerusakan mesin Boiler I yang mengakibatkan gangguan produksi minyak kelapa sawit secara keseluruhan. Tahapan pertama yang dilakukan sebagai usaha peningkatan efisiensi produksi adalah dengan melakukan penerapan Total Productive Maintenance melalui pengukuran efektifitas mesin Boiler I menggunakan metode OEE (Overall Equipment Effectiveness). Selanjutnya dilakukan perhitungan OEE six big losses untuk mengetahui tingkat penurunan efisiensi pada masing-masing faktor six big losses. Melalui perhitungan akan diketahui faktor apa yang memberikan kontribusi terbesar terhadap penurunan efisiensi mesin Boiler I. Dari hasil perhitungan diperoleh nilai OEE selama periode April 2017-Maret 2018 pada mesin Boiler I berkisar antara 78,12 % sampai 89,23 %. Nilai OEE ideal sebesar 85 % hanya diperoleh selama 5 bulan produksi. Faktor terbesar yang mempengaruhi nilai OEE dan menjadi prioritas untuk dieliminasi pada mesin Boiler I adalah faktor Equipment Failures sebesar 59,42 % dan faktor Idling/Minor Stoppages sebesar 31,34 %. Tindakan perbaikan yang diusulkan adalah usulan penerapan autonomous maintenance, memberikan training bagi operator Boiler dan teknisi bengkel, meningkatkan frekuensi perawatan mesin Boiler, menetapkan standar pelaksanaan pemeliharaan mesin Boiler, pengaturan ulang bahan bakar mesin Boiler serta melakukan meningkatkan pengawasaan dan kesadaran operator tentang kebersihan lingkungan kerja.en_US
dc.description.abstractPalm Oil Factory Sei Intan District PT. Perkebunan Nusantara V Riau is a company that specializes in palm oil processing. The company always have a problem that deals with the efficiency of a machine caused by inaccurate handling dan maintenance of production machine. This can be seen in the damage to the Boiler machine I which results in disruption of overall palm oil production. The first step taken as an effort to increase production efficiency is by implementing Total Productive Maintenance through measuring the effectiveness of Boiler machine I using the OEE method (Overall Equipment Effectiveness). Then the OEE six big losses calculation is carried out to determine the level of decline in efficiency in each of six big losses factor. From the calculation results obtained the value of OEE during the period April 2017-Maret 2018 on Boiler Machine I ranged from 78,12 % to 89,23 %. The Ideal OEE value of 85 % is only obtained for 5 months production. The biggest factor that affects the OEE value and becomes a priority to be eliminated on the Boile machine I is a factor equipment failures as big as 59,42 % and factor of Idling/Minor Stoppages as big as 31,34 %. The proposed corrective action is a proposal to implement autonomous maintenance, provide training for Boiler operators and workshop technicians, increase the frequency of Boiler machine maintenance, set standard for implementing Boiler machine maintenance, rearranging Boiler machine fuel and increasing operator supervision and awareness about the cleanliness of the work environment.en_US
dc.language.isoiden_US
dc.publisherUniversitas Medan Areaen_US
dc.relation.ispartofseriesNPM;178150120-
dc.subjecttotal productive maintenanceen_US
dc.subjectsix big lossesen_US
dc.subjectpeningkatan efisiensien_US
dc.subjectpabrik kelapa sawiten_US
dc.titleStudi Penerapan Total Productive Maintenance (TPM) Untuk Peningkatan Efisiensi Pada Pabrik Kelapa Sawit Kebun Sei Intan PTPN V Riauen_US
dc.typeThesisen_US
Appears in Collections:SP - Industrial Engineering

Files in This Item:
File Description SizeFormat 
178150120 - Andi Warizki - Fulltext.pdffulltext1 MBAdobe PDFView/Open
178150120 - Andi Warizki - Chapter IV.pdf
  Restricted Access
chapter IV799.83 kBAdobe PDFView/Open Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.