Please use this identifier to cite or link to this item:
https://repositori.uma.ac.id/handle/123456789/15043
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.advisor | Sutrisno | - |
dc.contributor.advisor | Hasibuan, Chalis Fajri | - |
dc.contributor.advisor | Polewangi, Yudi Daeng | - |
dc.contributor.author | Zuhri, Aflaha | - |
dc.contributor.author | Hasibuan, Reza Rinaldi | - |
dc.date.accessioned | 2021-06-22T03:02:12Z | - |
dc.date.available | 2021-06-22T03:02:12Z | - |
dc.date.issued | 2019-09 | - |
dc.identifier.uri | http://repository.uma.ac.id/handle/123456789/15043 | - |
dc.description | 115 Hlm | en_US |
dc.description.abstract | Adapun kesimpulan yang dapat diambil dai hasil penelitian Kerja Praktek di PKS PTPN IV Gunung Bayu antara lain sebagai berikut: 1. Bahan baku yang diolah oleh PKS PTPN IV Gunung Bayu diperoleh dari kebun PTPN IV Gunung Bayu sendiri. 2. PTPN IV Gunung Bayu merupakan pabrik kelapa sawit berkapasitas 30 ton/jam. 3. Dari hasil proses pengolahan kelapa sawit dapat diperoleh beberapa produk yaitu: a. Minyak Sawit (CPO) sebagai produk utama, b. Inti Sawit sebagai produk utama, c. Janjang Kosong sebagai pupuk tanaman dan kompos, d. Limbah. 4. Haisl produk CPO dari Kernel rata-rata telah mencapai standard kualitas proses kontrol. | en_US |
dc.language.iso | id | en_US |
dc.publisher | Universitas Medan Area | en_US |
dc.relation.ispartofseries | NPM;168150070 | - |
dc.relation.ispartofseries | NPM;168150020 | - |
dc.subject | standard mutu bahan | en_US |
dc.subject | standard mutu produk | en_US |
dc.subject | stasiun penerimaan buah | en_US |
dc.subject | jembatan timbang | en_US |
dc.subject | sortasi | en_US |
dc.subject | stasiun loading ramp | en_US |
dc.subject | lori | en_US |
dc.subject | sling dan bollards | en_US |
dc.subject | capstand | en_US |
dc.subject | track lier | en_US |
dc.title | Laporan Kerja Praktek di Pabrik Kelapa Sawit Unit Gunung Bayu PT Perkebunan Nusantara IV Sumatera Utara | en_US |
dc.title.alternative | Job Training Report at the Gunung Bayu Palm Oil Mill Unit PT Perkebunan Nusantara IV North Sumatra | en_US |
dc.type | Working Paper | en_US |
Appears in Collections: | Laporan Kerja Praktik (LKP) |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Aflaha Zuhri - Laporan Kerja Praktek di Pabrik Kelapa Sawit Unit Gunung Bayu PT. Perkebunan Nusantara IV Sumatera Utara.pdf | Aflaha Zuhri | 9.58 MB | Adobe PDF | View/Open |
Reza Rinaldi Hasibuan - Laporan Kerja Praktek PT. Perkebunan Nusantara IV PKS Gunung Bayu Sumatera Utara.pdf | Reza Rinaldi Hasibuan | 12.98 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.