Title: | Analisis Keseimbangan Lintasan Proses Produksi Dandang Alumunium dengan Metode Ranked Positional Weight di CV Cipta Jaya |
Other Titles: | Analysis of the balance of the aluminum production process trajectory using the Ranked Positional Weight Method at CV Cipta Jaya |
Authors: | Purba, Daniel |
metadata.dc.contributor.advisor: | Sutrisno Polewangi, Yudi Daeng |
Keywords: | keseimbangan lintasan produksi;line efficiency;ranked position weight;rpw;production line balance |
Issue Date: | 25-Mar-2022 |
Publisher: | Universitas Medan Area |
Series/Report no.: | NPM;178150093 |
Abstract: | Perkembangan industri di Indonesia mengalami peningkatan cukup cepat. Persaingan didunia industri mengharuskan perusahaan agar bisa menaikkan performa perusahaan agar bisa bersaing dengan pesaing lain. Pembuatan dandang alumunium melalui berbagai proses diantaranya, persiapan barang, pembuatan pola pada bahan, pengukuran bahan aluminium, pemotongan bahan aluminium, perakitan bahan aluminium, penghalusan pada bahan, serta pengecekan dan finishing. Dengan tujuan penelitian 1. Untuk Mengetahui penyebab ketidak seimbangan lini produksi di CV. Cipta Jaya 2. Untuk mengetahui tingkat efisien pada lintasan produksi di CV. Cipta Jaya. Jumlah Stasiun kerja yang dibutuhkan di CV. Cipta Jaya supaya bisa menghasilkan keseimbangan lini produksi yang optimal. Proses pembuatan dandang alumunium memakai metode Ranked Positional Weight dengan kondisi awal berjumlah 7 stasiun kerja menjadi 4 stasiun kerja. Dari metode tersebut dapat disimpulkan bahwasanya menggunakan metode Ranked Position Weight lebih optimal dikarenakan biasa meminimalisir jumlah stasiun kerja yang ada. Peningkatan line efficiency yang dapat diperoleh dari penyeimbangan lini yang dibentuk dengan metode Ranked Positional Weight (rpw) mengalami peningkatan produksi sebesar 54,45% dimana kondisi awal yang berjumlah 16.66%. diperlukan waktu tambahan dalam bekerja agar bisa memenuhi kapasitas produksi yang ada. Industrial development in Indonesia has increased quite rapidly. Competition in the industrial world requires companies to be able to improve the company's performance in order to compete with other competitors. The manufacture of aluminum boilers goes through various processes including, preparation of goods, making patterns on materials, measuring aluminum materials, cutting aluminum materials, assembling aluminum materials, refining materials, as well as checking and finishing. With research objectives 1. To find out the cause of the imbalance in the production line at CV. Cipta Jaya 2. To find out the level of efficiency on the production line at CV. Cipta Jaya. The number of work stations needed in the CV. Cipta Jaya in order to produce an optimal balance of production lines. The process of making aluminum boilers uses the Ranked Positional Weight method with the initial conditions being 7 work stations to 4 work stations. From this method, it can be concluded that using the Ranked Position Weight method is more optimal because it usually minimizes the number of existing work stations. The increase in line efficiency that can be obtained from line balancing formed by the Ranked Positional Weight (rpw) method has increased production by 54.45% where the initial conditions amounted to 16.66%. additional time is needed to work in order to meet the existing production capacity. |
Description: | 47 Halaman |
URI: | http://repository.uma.ac.id/handle/123456789/17054 |
Appears in Collections: | SP - Industrial Engineering |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
178150093 - Daniel Purba - Fulltext.pdf | Cover, Abstract, Chapter I, II, III, V, Bibliography | 944.65 kB | Adobe PDF | View/Open |
178150093 - Daniel Purba - Chapter IV.pdf Restricted Access | Chapter IV | 678.23 kB | Adobe PDF | View/Open Request a copy |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.