Please use this identifier to cite or link to this item: https://repositori.uma.ac.id/handle/123456789/22643
Title: Perencanaan Produksi Pabrik Kelapa Sawit Berdasarkan Perkiraan Hasil Panen Pada PT. Perkebunan Nusantara IV Kebun Pasir Mandoge
Other Titles: Palm Oil Factory Production Planning Based on Estimated Harvest Results at PT. Perkebunan Nusantara IV Kebun Pasir Mandoge
Authors: Zulianto
metadata.dc.contributor.advisor: Mustafa, Kamil
Batubara, Akri Adil
Keywords: Produksi Pabrik Kelapa Sawit;Palm Oil Factory Production
Issue Date: 2002
Publisher: Universitas Medan Area
Series/Report no.: NPM;898150032
Abstract: Perencanaan produksi didasarkan pada perkiranaan hasil panen dengan metode peramalan berdasarkan umur tanaman dan luas areal. Kapasitas yang tersedia didasarkan pada kapasitas stasiun perebusan. Production planning is based on crop yield estimates with a forecasting method based on plant age and area area. Available capacity is based on the capacity of the boiling station.
Description: 95 Halaman
URI: https://repositori.uma.ac.id/handle/123456789/22643
Appears in Collections:SP - Industrial Engineering

Files in This Item:
File Description SizeFormat 
898150032 - Zulianto - Chapter IV.pdf
  Restricted Access
Chapter IV2.5 MBAdobe PDFView/Open Request a copy
898150032 - Zulianto - Fulltext.pdfCover, Abstract, Chapter I, II, III, V, Bibliography4.92 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.