Please use this identifier to cite or link to this item:
https://repositori.uma.ac.id/handle/123456789/5449
Title: | Pengaruh Metode Pelaksanaan terhadap Durasi Pelaksanaan Pekerjaan (Studi Literature) |
Authors: | Yanto, Budi |
metadata.dc.contributor.advisor: | advisor |
Keywords: | Management;Construction |
Issue Date: | 24-Oct-2004 |
Publisher: | Universitas Medan Area |
Abstract: | The role of Construction Management in Applying Project is very importanr to get succcsfull project To get the good quality, finishing job faster then the time determined and the economical cost are hoped by every construction company or pason active in this job. The applying good method can effect the duration of applying job, to get these aims. The Construction Method and the Duration of Project Construction are very unponant in managing project. Their funcuons are as a pilot in projectt construction. Beside that, the Construction Method or Time Schedule have become a requirement in Managing the offer of Project they also have high quality in winning the offer of Project. |
URI: | https://repositori.uma.ac.id/handle/123456789/5449 |
Appears in Collections: | SP - Civil Engineering |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
008110013_File1.pdf | Cover | 277.87 kB | Adobe PDF | View/Open |
008110013_File2.pdf | Abstract | 279.84 kB | Adobe PDF | View/Open |
008110013_File3.pdf | Introduction | 676.63 kB | Adobe PDF | View/Open |
008110013_File4.pdf | Chapter I | 390.81 kB | Adobe PDF | View/Open |
008110013_File8.pdf | Reference | 352.79 kB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.